Find or Sell any Parts for Your Vehicle in USA

Hyundai I20 3d Active 2012-2015 3hatch Silver Manual 1.4 Antenna Base on 2040-parts.com

AU $45.00
Location:

Kudla, SA, Australia

Kudla, SA, Australia
Condition:Used Brand:HYUNDAI

WILL'S AUTO PARTS


HYUNDAI I20 3D ACTIVE 2012-2015 3HATCH  SILVER MANUAL 1.4 ANTENNA BASE










Please give us your inquiries about




HYUNDAI I20 3D ACTIVE 2012-2015 3HATCH  SILVER MANUAL 1.4




Now Wrecking!!! Whole parts are available!!!

Body Parts : Guards, Front&Rear Bars Complete, Tailgates, Doors, Headlights, Taillights, Bonnet, Grille

Electrical Parts : Altenator, Starter Motor, AirBags, Regulators, Electric Windows, Switches, ECU

Mechanical Parts : Engine, Gearbox, Struts, Power Steer Pump, Water Pump

Interior Parts : Seats, Trim, Instrument Cluster

 

 

If you need a price or other information, contact us or visit us!!

e-mail : freshwill2@gmail.com  //  (08) 8254 8886

Mercedes-Benz adds equipment, holds prices on the 2012 M-class

Tue, 12 Jul 2011

Mercedes-Benz USA is holding prices steady on the first two models of the new generation M-class crossover. The 2012 ML350 4Matic starts at $49,865, unchanged from the 2011 model. The ML350 BlueTec 4Matic diesel starts at $51,365, also unchanged.

Seat Ibiza Ecomotive

Wed, 12 Sep 2007

By Ben Barry Motor Shows 12 September 2007 07:28 Seat Ibiza Ecomotive: the lowdown Even the Spanish went green at Frankfurt. Using the Polo BlueMotion’s 1.4-litre TDi engine, longer gear ratios and Dunlop tyres that generate less friction, the Ibiza Ecomotive will deliver 74.3mpg and emit just 99g/km CO2, meaning it is tax exempt and, should Ken Livingstone’s recent proposals be approved, get into London’s Congestion Charge zone for free. Performance figures are yet to be announced, but expect 77bhp, 144lb ft torque, a 0-60mph time of around 12.8sec and a top speed of 109mph – figures in line with the Polo.

GM stops Chevy Volt production to trim inventory

Fri, 02 Mar 2012

General Motors will idle the Detroit-area assembly plant that builds the Chevrolet Volt for more than a month to curb rising inventories of the plug-in hybrid. On March 1, GM told 1,300 workers at its Detroit-Hamtramck assembly plant in Michigan that it will shut down production for five weeks, starting the week of March 19. GM plans to resume production on April 23, spokesman Chris Lee said.