Ims 125511-n2 Large Capacity Gas Tank - Natural - 4.0gal. on 2040-parts.com
Cedar Park, Texas, United States
Fuel Tanks for Sale
- 2004 can-am ds650 gas fuel tank w/ billet cap and petcock(US $79.95)
- Yamaha blaster 200 yfs200 fuel tank bolts front collars washers(US $24.95)
- Yamaha blaster 200 yfs200 fuel tank rubber oem flap cover(US $14.35)
- Yamaha blaster 200 yfs200 fuel tank oem flap cover plastic engine carburetor(US $49.95)
- 1998-2004 honda 450 400 foreman gas fuel tank with cap and petcock#113(US $200.00)
- 2015 honda trx420fe1 rancher oem gas tank fuel tank w/ fuel pump(US $125.00)
Battery breakthrough set to accelerate electric-car development
Thu, 12 Mar 2009A team of scientists working at the Massachusetts Institute of Technology are claiming a significant breakthrough in recharging times for lithium-ion batteries. According to findings published in the scientific journal Nature, MIT researchers Byoungwoo Kang and Gerbrand Ceder have unlocked the potential of lithium-ion batteries by patenting a unique process which is claimed to allow a typical laptop power pack to be fully recharged in less than a minute--an improvement in recharging performance of roughly 90 percent over existing lithium-ion batteries. Lithium-ion batteries generate electric current via the flow of lithium ions across an electrolyte, from an electrode to a cathode.
Porsche Museum ready to open
Tue, 20 Jan 2009Porsche's new museum opens 31/01/2009 [ad#ad-1] Porsche’s new state-of-the-art museum, located next to Porsche HQ in Zuffenhausen, Stuttgart, and estimated to have cost €100 million to build, is now finished and ready to start taking visitors from 31/01/2009. The Porsche museum is a stunning building, holding an equally stunning collection of cars, marking Porsche’s long history. But these are not dusty museum pieces.
Repair work to hit key road route
Tue, 24 Sep 2013A KEY ROAD ROUTE into London will be affected by closures at some weekends next summer for the completion of repair work. The summer 2014 work will be on the Hammersmith Flyover on the A4 in west London. Before that, there will be night-time lane closures starting next month as the final phase of work to strengthen the flyover's 16 spans begins.