Iron Rock Off Road - Critical Path Rear Long Arm Upgrade - Jeep Wj (99-04) on 2040-parts.com
Shakopee, Minnesota, US
Lift Kits & Parts for Sale
Rough country tj 4" x-series long arm suspension - iron rock off road(US $1,599.95)
Iron rock off road - 99-04 jeep grand cherokee - wj 4" long arm lift kit (US $1,349.99)
Iron rock off road - new - xj (84-01) cherokee 5.5" suspension lift kit(US $1,349.99)
Iron rock off road -rough country coil springs 9275 multiple applications(US $99.99)
2007-2014 jeep wrangler 2 door 3" stage 3 lift kit fox racing shox mopar oem(US $2,400.00)
Trailmaster cl220 front leveling kit chevrolet/gmc fire sale(US $73.69)
SRT Viper production halted amid slow sales
Wed, 19 Mar 2014Chrysler has made the decision to suspend production of the SRT Viper for a least two months, citing slow sales. The move is expected to result in layoffs of 91 hourly workers at Chrysler's Conner Avenue Assembly plant in Detroit. Back in October of 2013, Chrysler cut Viper production by a third, citing slow sales and growing inventories.
Aston Martin Virage dropped – to be replaced by new DB9
Thu, 30 Aug 2012Less than eighteen months since it debuted – and after just over 1,000 cars – Aston Martin is dropping the Virage. The Aston Martin Virage always seemed a bit of a stretch too far for Aston Martin, and so it has proved. After a lifespan of no more than eighteen months – and with just over 1000 cars built – Aston Martin has decided that there are just too few buyers who feel the Virage is enough of a step up from the DB9 to warrant the extra cost.
Interior Motives Awards 2012 judges decide shortlist
Tue, 17 Jul 2012The Interior Motives Awards 2012 judging panel has whittled down a huge amount of entries into this year's competition to a shortlist of potential winners. The list can be viewed here. Over 160 aspiring young designers from 47 schools in 17 countries entered the competition, reflecting the growing recognition of the importance of the Interior Motives Student Design Awards among would-be vehicle designers.