Find or Sell any Parts for Your Vehicle in USA

Iron Rock Off Road - Xj 6.5" Critical Path Long Arm Lift Kit - $1449.99 on 2040-parts.com

US $1,499.99
Location:

Shakopee, Minnesota, US

Shakopee, Minnesota, US
Returns Accepted:Returns Accepted Item must be returned within:30 Days Refund will be given as:Money Back Return policy details:Our policy is simple, if there is something about your purchase you don't like, we'll make it right. If we can't make you happy you can return your product within 45 days for a full refund of the purchase price, excluding shipping and handling. Returns of damaged items are not possible. Items not in new, salable condition will be subject to a re-stocking fee. A copy of your invoice is required for all warranty or satisfaction guarantee claims. Return shipping will be paid by:Buyer Restocking Fee:No Manufacturer Part Number:IR-X6LK

Chevrolet WTCC Ultra (2006): first official pictures

Thu, 28 Sep 2006

By Phil McNamara First Official Pictures 28 September 2006 09:48 Chevrolet Ultra: the lowdown Hidden beneath the WTCC Ultra's wild touring car looks is Chevrolet's 2008 Ford Focus rival. GM's headline concept car at today’s Paris motor show (Thursday 28), the Ultra previews Chevrolet's future design direction, as well as the Lacetti replacement. Although the muscular bodykit, ultra-wide track, funky graphics and slitty rear window will all be toned down for production, 'you won’t miss the connection when the production car arrives,' a GM insider told CAR Online.

2015 Volkswagen Jetta facelift price & specs – costs from £18,815

Tue, 12 Aug 2014

The facelifted VW Jetta is now on sale in the UK The Volkswagen Jetta – a VW Golf with a boot – is getting a bit of a facelift for 2015 (although you’d be hard-pushed to see the changes) and now, after its reveal at the New York Motor Show in April, it’s going on sale in the UK. Although the cosmetic changes to the Jetta are minor – the usual tweaks to the back and front, including a revised grill – VW claim the small changes it’s made result in a Jetta that’s ten per cent more aerodynamic (which makes you wonder why they didn’t do it earlier). The visual changes inside are just as minor, with a new steering wheel, new trims and new fabric options, with ambient lighting fitted to the Jetta GT.

Ford EcoSport concept

Wed, 04 Jan 2012

Ford is choosing the New Dehli Auto Expo to unveil its EcoSport concept. The all-new crossover vehicle is comparable to the Fiesta in size and is built atop Ford's new B-Car architecture. Designed in Brazil under the direction of Joa Marcos De Oliveira Ramos, the EcoSport is poised to be a significant part of the company's ‘One Ford' strategy that will see the previously Brazilian only EcoSport rolled out further afield in markets both developing and mature.