Iron Rock Off Road - Zj 5.5" Critical Path Long Arm Kit 93-98 on 2040-parts.com
Shakopee, Minnesota, US
Lift Kits & Parts for Sale
- Iron rock off road - new 3" suspension lift kit xj jeep cherokee 84-01(US $339.99)
- Iron rock off road - 4"suspension lift kit ,jk jeep wrangler (07-10) 2/4door(US $499.95)
- Iron rock off road - 7" premium lift kit zj jeep grand cherokee 93-98(US $2,499.99)
- Iron rock off road - zj 7" critical path long arm kit 93-98(US $1,499.99)
- Iron rock off road - 6" suspension lift kit for tj jeep wrangler (1997-2006)(US $1,049.95)
- Iron rock off road - stainless steel braided brake line kit for xj (84-01)(US $99.99)
Tesla Model S EV UK launch – Tesla considering patent giveaway
Mon, 09 Jun 2014Elon Musk (pictured) launches RHD Model S in UK The electric Tesla Model S – probably the only electric car that makes sense – has finally been launched in the UK in right hand drive, with the first five Model S customers taking delivery of their cars. With a starting price of £50,280 (after the £5k taxpayer bribe) the Model S represents a real first for EVs; the first EV that can do pretty much anything an ICE car can, and more beside. With a range of up to 312 miles, seating for up to seven (well, 5+2), low running costs, great performance (0-60mph in 4.2 seconds) low service costs, no VED, no congestion charge and, at least until 2015, no BIK for business users, it’s not only almost as practical as a comparable ICE car it’s massively cheaper to run.
Mini Cooper SD (2011): the faster diesel Mini
Wed, 02 Feb 2011Mini today finally went official with the high-performance diesels we scooped last year. The Cooper SD trim is available across the Mini range, on the hatch, convertible, Clubman estate and Countryman junior SUV. It's a 2.0-litre four-cylinder turbodiesel generating 141bhp and 225lb ft from 1750-2700rpm.
Kia Ceed (2012) first official pictures
Fri, 13 Jan 2012The first Kia Ceed, launched in 2006, signalled a step change for the Korean car company. Not only was it designed and built in Europe (in Germany and Slovakia respectively) but it was also good enough to be considered a worthy rival for the Focus, Golf, Astra et al. From Soul to Optima, from Picanto to Rio, nearly everything that's followed has been good or great.