Jeep Wrangler Tj External Slave Clutch Master With Line 2001 1281 on 2040-parts.com
Oxford, Massachusetts, US
Part Description:
Other for Sale
- Jeep wrangler tj external slave clutch master with line 1997 1525(US $34.99)
- Jeep wrangler tj 97-06 passenger front female seatbelt 1283(US $25.00)
- Gto firebird trans am lemans catalina bonneville 4 speed bellhousing 4 spd(US $99.00)
- Omix-ada 18888.07 - 1987 jeep cherokee second speed gear m/t(US $129.99)
- Subaru oem 621026070 rear suspension-spindle(US $29.41)
- 1965-66 mustang transmission crossmember t-5 conversion(US $109.95)
Brabus unleashes Mercedes-Benz SL850 6.0 Biturbo
Thu, 13 Feb 2014We still remember a time when Brabus' Mercedes-Benz cars were tough to pick out in a crowd, but with the current generation of cars from this Bottrop-based tuning house everyone will be able to spot them from a mile away. Given the maximum speed of some of its cars, that's not a bad thing by any means. And even though Brabus has recently attracted attention for its treatment of the facelifted G-class and the new Mercedes-Benz S-class, their latest reworking of the Mercedes-Benz SL63 AMG is sure to reset the bar when it comes to the SL-class.
Jaguar XE Roadster WILL get 3.0 litre diesel
Tue, 02 Aug 2011This Jaguar XE is running a 3.0 litre diesel lump Earlier today we ran an update on the ongoing speculation on Jaguar’s small sports car, confirming that Jaguar will debut the Jaguar XE at Frankfurt in September. And now we can add to that by reporting that it WILL be getting the option of a 3.0 litre diesel lump when it goes on sale in 2012. We’ve speculated for some time that Jaguar will add the very good 3.0 litre TDV6 from the XJ and XF to the range of engines on the XK.
GM spending $336 million on plant upgrades for Volt production
Mon, 07 Dec 2009General Motors on Monday said it would spend $336 million on upgrades to the Hamtramck plant near downtown Detroit to build the Chevrolet Volt hybrid car. The plant will begin building Volt prototypes next spring, using the Hamtramck plant's existing production line. Production of saleable vehicles begins next fall.