K&n Filters 33-2011 - Air Filter; Panel; H-0.75 In.; L-5.75 In.; W-16.5 In. on 2040-parts.com
Frederick, Maryland, US
K&N Filters 33-2011 - Air Filter; Panel; H-0.75 in.; L-5.75 in.; W-16.5 in.
International Buyers - Please Note:
|
Air Filters for Sale
- K&n filters 33-2018 - air filter; panel; h-1.563 in.; l-13 3/8 in.; w-6.563 in.(US $46.04)
- K&n filters 33-2023 - air filter; panel; h-1 1/8 in.; l-5.75 in.; w-12.75 in.(US $39.95)
- K&n filters 33-2521 - air filter; panel; h-7/8 in.; l-10 5/8 in.; w-7 3/8 in.(US $38.56)
- K&n filters 33-2479 - air filter; panel; h-1.031 in.; l-9 1/8 in.; w-4 in.(US $40.37)
- K&n filters 33-2481 - air filter; panel; h-1.063 in.; l-11.688 in.; w-7.813 in.(US $40.95)
- K&n filters 33-2530 - air filter; panel; h-1 in.; l-8.25 in.; w-13 5/8 in.(US $44.49)
Renaultsport Megane teased
Wed, 18 Feb 2009These car manufacturers do love to tease. One after another they come up with ways to ‘leak’ a little info, or present us with teaser images (like the Fiat 500C last week). And now Renault are playing the game ahead of the reveal of the Renaultsport Megane at Geneva in a few weeks.
McLaren MP4-12C to charge hill at Goodwood with Button and Hamilton at the wheel
Wed, 30 Jun 2010The McLaren MP4-12C will make its much-anticipated public debut at Goodwood, and yet another advanced prototype will charge up the famous hill in the supercar portion of the event--driven by none other than McLaren Formula One stars Jenson Button and Lewis Hamilton. They'll be piloting the VP9 validation prototype finished in traditional McLaren orange. In addition to the hill charge, a new prototype will be on display with all of the carbon-fiber fittings, including splitter, engine covers and seatbacks.
Workers misspell 'bus' on road markings
Tue, 26 Aug 2014WORKMEN have given road users something to chuckle about by misspelling the word 'bus' during roadworks. "Bup stop" was painted on to the road surface in Bristol in large yellow lettering at the end of last week, with the stencilled letter P used instead of S. The mistake was made as part of road repairs which are likely to last up to four weeks in the Old Market area of the city centre.