K&n Filters 33-2357 - Air Filter; Panel; H-1 1/16 In.; L-10 7/16 In.; W-6.25 In. on 2040-parts.com
Frederick, Maryland, US
K&N Filters 33-2357 - Air Filter; Panel; H-1 1/16 in.; L-10 7/16 in.; W-6.25 in.
International Buyers - Please Note:
|
Air Filters for Sale
- K&n filters 33-2276 - air filter; panel; h-2 3/8 in.; l-15 1/8 in.; w-11 1/8 in.(US $37.50)
- K&n filters 33-2155 - air filter; panel; h-7/8 in.; l-7 15/16 in.; w-9 1/8 in.(US $37.77)
- K&n filters 33-2277 - air filter; panel; h-15/16 in.; l-12 15/16 in.; w-5 5/8(US $39.07)
- K&n filters 33-2285 - air filter; unique; h-1.75 in.; l-11.63 in.; w-10.44 in.(US $40.37)
- K&n filters 33-2677 - air filter; panel; h-7/8 in.; l-13.313 in.; w-3 7/8 in.(US $38.33)
- K&n filters 33-2888 - air filter; panel; h-1 3/16 in.; l-15 13/16 in.; w-6.75(US $44.39)
Aston Martin to axe a third of jobs
Mon, 01 Dec 2008Aston Martin today announced 600 potential redundancies. It is consulting with the unions to lose 300 permanent jobs and 300 temporary staff By Tim Pollard Motor Industry 01 December 2008 14:00 Aston Martin announced at 2.00pm today that it is to cut a third of its UK workforce in a response to a slump in sales. The company, based in Gaydon, Warwickshire, said it today launched a consultation with the unions to cut 300 permanent jobs and 300 temporary posts – out of a total of 1850 employees.
Chinese Grand Prix (2012) RESULT
Sun, 15 Apr 2012China F1 Grand Prix 2012 - Mercedes front row With Mercedes locking out the front row in Shanghai, can Rosberg or Schumacher give Mercedes their first win? Or will the McLarens come from behind? Qualifying for the 2012 F1 Grand Prix in China left a very off looking grid.
GM disbands unit that creates high-performance vehicles
Wed, 18 Feb 2009General Motors, focusing on mainstream products in a battle to survive, has scrapped a unit that produced high-performance vehicles. GM on Wednesday disbanded High Performance Vehicle Operations, which is based at the company's suburban Detroit technical center, and redeployed its engineers, spokesman Vince Muniga said. "All high-performance projects are on indefinite hold," Muniga said.