K Source/fit System 60529c Door Mirror Passenger Side on 2040-parts.com
Tallmadge, Ohio, US
Mirrors for Sale
- K source/fit system 65007y door mirror passenger side(US $49.92)
- K source/fit system 61146f door mirror driver side(US $110.99)
- K source/fit system 99237 door mirror glass(US $10.97)
- K source/fit system 90174 door mirror glass(US $5.97)
- K source/fit system 61106f door mirror driver side(US $62.94)
- K source/fit system 63027h door mirror passenger side(US $49.92)
Tesla Motors open-sources patents
Fri, 13 Jun 2014Since Elon Musk founded Tesla Motors a decade ago, his electric car venture has been a thorn in the traditional auto manufacturers' side. Now, Musk has made another disruptive move by announcing he is scrapping the firm's patents. In a blog post on the Tesla website, he wrote "[the patents] have been removed, in the spirit of the open source movement, for the advancement of electric vehicle technology.
Aston Martin confirms Middle East-only Lagonda super-saloon
Fri, 25 Jul 2014By John Mahoney Motor Industry 25 July 2014 16:54 Aston Martin has confirmed it will once again make a Lagonda super-saloon - but only for Middle Eastern markets. The details of Aston’s secret plans to resurrect its luxurious nameplate for a small production run of luxury saloons were revealed in the July 2014 issue of CAR following our spy photographer captured a wedgy four-door saloon testing on the roads around Aston Martin’s Gaydon HQ in Warwickshire. The mule we snapped, like the production car set to arrive in 2015, is based on Aston’s familiar VH architecture that underpins the four-door Aston Martin Rapide.
First sight of Pininfarina-designed Eurostar trains
Fri, 19 Oct 2012Eurostar has unveiled the first images of its new Pininfarina-designed e320 trains that are currently under construction in Germany. A £700m overhaul of the Eurostar fleet has seen a refurbishment of its existing trains as well as the purchase of 10 new trains designed by the Italian design house. The entire new Eurostar fleet should be completed by 2015 with production of the new e320 trains and refurbishment of the existing trains well underway.