Lap Timer Beacon - Aim - Go Kart Racing Used W/mychron 4, Alfano, Etc. Gauges on 2040-parts.com
Lebanon, Maine, United States
Used but seems like it is all there. I never used it, I don't know how it works.
Any questions please feel free to contact me. Thanks |
12-Volt Portable Appliances for Sale
- Craftsman emergency auto air inflator/compressor with flashlight - make offer(US $30.00)
- 12 volt mobile car heater
- Norcold inc. refrigerators 617944 gas valve thermostat control(US $154.02)
- Norcold inc. refrigerators 619041 right spring holder assembly(US $22.19)
- Hella horn wiring harness kit for 12 volt relay free worldwide shipping
- Camco 57061 pop-a-bag (white)(US $10.24)
Jeep shows six Moab Easter Jeep Safari concepts
Thu, 10 Apr 2014Jeep introduced six concepts headed for the Moab Easter Jeep Safari next week. Three of the off-road ready concepts were based on the Wrangler, two on the new Cherokee and the last was a gently warmed over version of the Grand Cherokee. This is the 12th year that the Jeep brand is participating in the event, but it'll be the 48th Easter Jeep event overall.
Nissan to slash jobs, production after forecasting $2.9 billion loss
Mon, 09 Feb 2009Reversing his profit forecast to a loss, Nissan Motor Co. CEO Carlos Ghosn entered crisis mode on Monday. Ghosn announced plans to slash 20,000 jobs, cut production by 20 percent, scale back model launches and delay new factories.
SAE approves new fast-charging standard for EVs, plug-ins
Tue, 16 Oct 2012SAE International said it has approved a new technical standard that will dramatically reduce charging times for plug-in hybrid electric vehicles and electric vehicles. The global engineering group said the new charging standard, developed with the cooperation of more than 190 automakers, utilities and equipment builders, will allow charging times to be reduced from as long as eight hours to as short as 20 minutes. Automakers want DC direct charging to take less than 10 minutes, or roughly the time it takes to fill a tank with gasoline.The goal is to accommodate currents as high as 500 volts distributed from public charging stations.