Find or Sell any Parts for Your Vehicle in USA

Left Driver Side Replacement Tail Light Lamp 93-98 Toyota T100 Pickup 8156034010 on 2040-parts.com

US $57.63
Location:

Ontario, California, US

Ontario, California, US
Returns Accepted:Returns Accepted Refund will be given as:Money Back Item must be returned within:60 Days Return policy details:Item must be in original packaging, brand new, and never installed. Return shipping will be paid by:Buyer Restocking Fee:No Manufacturer Part Number:TO2800119 Interchange Part Number:8156034010 Warranty:Yes

Headlights for Sale

Driven: Chevrolet Volt

Tue, 21 Sep 2010

Meeting the Chevrolet Volt could easily have been an anti-climax. This is a design that ‘feels' nearly four years old — the concept first seen in Detroit in 2007. Together with the online hype surrounding it, and the part it plays in GM's renaissance, the weight of expectation is alarmingly high.

Peugeot HX1 to go in to production as Peugeot 608?

Tue, 18 Oct 2011

Peugeot HX1 to go in to production as the 608? Big Peugeots have never really sold anywhere but France. So it seemed sensible when Peugeot revealed that the 407 and 607 would be replaced by the 508.

Lamborghini CO2 reduction Press Release

Sun, 07 Jun 2009

Lamborghini CO2 Reduction Press Release • The construction of a large photovoltaic plant, combined with an energy-saving project, will achieve a 30% reduction in the factory’s CO2 emissions by 2010 • Modifications to vehicles will result in a 35% reduction in CO2 emissions by 2015 Automobili Lamborghini announces its intention to complete its program of environmental sustainability in record time by presenting new plans which will enable the company: The plans for reducing emissions will thus involve two areas: modifications to the Lamborghini factory in Sant’Agata Bolognese, and development in vehicle design. To redefine its industrial processes in accordance with its policy of environmental sustainability, Lamborghini has just begun a project to complete installation of a large photovoltaic system by the end of 2009. The roof-top plant will produce 1,582 Megawatt hour (MWh) of “green” energy per year, which translates into a 20% reduction in CO2 emissions (-1,067,820 Kg/year) by 2010.