Mariner Cup & Cone Bearing Set# 30894a1, 31-30894a1, 3130894a1 Mercury Boat 2 on 2040-parts.com
Gulfport, Mississippi, US
Please see attached pictures of our facility and visit our Ebay store! MARINE SUPPLY is a REAL business with an enormous 26,000 sq ft retail sales floor, many employees and several certified marine mechanics with decades of experience on both outboard and I/O marine engines. Buy with confidence that you will be purchasing from knowledgeable, trained professionals and a company that has been in business and prospered for the past 20 years! | |||||
|
Other for Sale
- #68v-81950-00-00 relay assembly 2000-12 115-300hp yamaha switch ~nb 7-2 box lo2~(US $53.13)
- Four stroke yamaha f225 #69j-13160-00-00 fuel rail 2002-2012 200hp 225hp ~542~#3(US $184.75)
- Gearcase extention #0308334 johnson/evinrude/omc 1968-1970 40hp outboard(US $95.00)
- Seat & thermostat #0433379 #433379 johnson/evinrude 1990-94 6-55 hp boat part(US $39.96)
- #6h4-81822-02-98 bracket 1994-2012 40/50hp yamaha outboard generator part~436~(US $59.99)
- Used power pack assy #0582125 for 1984 90hp johnson outboard motor 90mlcrd(US $55.00)
2012 Ducati Monster 1100EVO revealed
Tue, 25 Jan 2011For a naked bike, it’s loaded. Ducati has unveiled the latest addition to its top-selling Monster range, the 1100EVO, and this street fighter is packed with a list of technical and safety innovations. The 2012 Monster 1100EVO is the first Ducati to hit 100 hp from an air-cooled engine.
New 2015 Honda NSX – Made in America
Tue, 14 May 2013The new Centre – costing $70 million, stretching to 184,000 square feet and housed inside Honda’s old logistics facility – will employ 100 of Honda’s most skilled workers in Ohio to bolt the new NSX together, and even the engine will be assembled at Honda’s engine plant in Anna, Ohio. Not only has Honda revealed where the US-designed NSX will be built, but they’ve appointed their R&D chief engineer, Ted Klaus, to lead the team developing the new NSX and Clement D’ Souza, associate chief engineer at Honda USA, to head up production. Ted Klaus said: This new plant will be as unique as the vehicle we will build here.
Mercedes to build C-class in Alabama
Wed, 02 Dec 2009Mercedes-Benz will add production of C-class sedans to its plant near Tuscaloosa, Ala., starting in 2014. Daimler AG Chairman Dieter Zetsche, who participated in the creation of the Alabama plant project as a fast-rising executive in 1993, said in a statement released Wednesday from Stuttgart that the U.S. operation will take over about one-fifth of the model’s global production.