Mazda Oem N3h115350m Engine Coolant Recovery Tank-reservoir Assembly on 2040-parts.com
Brunswick, Ohio, US
Radiators & Parts for Sale
- Subaru oem 45162ag021 engine coolant recovery tank hose/coolant recovery(US $16.34)
- Godspeed mitsubishi eclipse (talon) 95-99 dsm gst gsx 4g63 aluminum radiator(US $179.95)
- Subaru oem 45162sc010 engine coolant recovery tank hose/coolant recovery(US $23.12)
- New 3 row radiator oldsmobile cutlass 70-76 all aluminum 8165-3aa(US $202.97)
- Godspeed 03-07 evolution evo 8 9 gsr mr 4g63 turbo aluminum radiator w /cap(US $189.99)
- Bmw e21 320is radiator(US $3.20)
Ferrari 250 GTO #3851 GT disappoints at $38 million
Fri, 15 Aug 2014The Ferrari 250 GTO #3851 GT makes ‘just’ $38 million Last month, we reported that a Ferrari 250 GTO was due to hit the auction room at Bonhams Quail Lodge sale and was expected to hit a massive record price, with estimates ranging from $60-100 million. On that basis, the sale was a complete failure. In fact, the 250 GTO – previously owned by Fabrizio Violati – managed to reach a relatively paltry $38.1 million (£22.8 million), with the actual price (before buyers premium) ‘just’ $34.6 million (£20.7 million).
Mini John Cooper Works convertible set for Geneva motor show
Tue, 10 Feb 2009Here's math we actually like: Mini. Plus John Cooper Works performance. Plus convertible.
New Range Rover gets Bridge of Weir Leather
Mon, 22 Oct 2012The new Range Rover (2013) is getting its sumptuous leather interior courtesy of Bridge of Weir Low Carbon Leathers Land Rover’s supplier of choice for the Range Rover’s leather is Bridge of Weir Leather Company, part of the Scottish Leather Group and a privately owned Scottish Company that just happens to be the UK’s only automotive leather manufacturer (although they may need to rephrase that in a couple of years if Alex Salmond gets his way). The big shout is that Bridge of Weir’s leathers are low carbon, but what’s more interesting than the trendy (and, some would say, pointless) shout out is just how efficient Bridge of Weir are. The Bridge of Weir factory has its own Thermal Energy Plant which provides 70 per cent of its needs (and will provide it all by 2015) and all the waste products are recycled instead of being discarded.