Mercedes-benz 190e W201 Central Door Lock Vacuum Pump on 2040-parts.com
West Des Moines, Iowa, US
Mercedes-Benz 190E W201 central door lock vacuum pump,
VDO, 124 800 14 48. Used part from 1993 190E,
may fit other Mercedes such as W124, tested.
Other Parts for Sale
- 1970 oldsmobile 442 cutlass mirror non remote 1971 1972 olds supreme(US $45.00)
- Fiat spider 124 2000 rear license plate lights(US $0.99)
- 78-81 toyota celica toyota supra left rear quarter vent glass trim(US $45.99)
- Airtex 4t1029 trailer connector(US $30.08)
- 72 73 74 cuda challenger jack charger a b e body demon 1971 1972 1973 1974 rt(US $70.00)
- Lexus flash light - heavy duty maglite in box.(US $31.95)
Hyundai i10 facelift (2011) first official pictures
Wed, 02 Feb 2011Hyundai today showed off the new i10 city car - one of the most popular small cars in the UK during last year's scrappage incentive scheme. As well as a cosmetic pick-me-up, the new 2011 Hyundai i10 gains a pair of new engines with stop-start tech for emissions nudging just under the magic 100g/km CO2 mark. The Hyundai i10 Blue emits 99g/km of carbon dioxide, and the Koreans claim it's the cheapest five-seat car on the market to hit sub 100g/km. Five seats?
Audi supercars
Mon, 28 Jul 2008By Ben Oliver 28 July 2008 12:35 Audi is the fledgling player in the supercar arena. Yes, it's shown numerous concepts over the years, but it wasn't until the 2007 R8 arrived that we could actually drive a supercar with Ingolstadt's four rings writ large on the grille. And what an effort: straight out of the box, the R8 has delivered a car with the poise of a 911 Carrera 4S with the ease-of-use of a Honda NSX.
First sight of Pininfarina-designed Eurostar trains
Fri, 19 Oct 2012Eurostar has unveiled the first images of its new Pininfarina-designed e320 trains that are currently under construction in Germany. A £700m overhaul of the Eurostar fleet has seen a refurbishment of its existing trains as well as the purchase of 10 new trains designed by the Italian design house. The entire new Eurostar fleet should be completed by 2015 with production of the new e320 trains and refurbishment of the existing trains well underway.