Mercedes-benz C W204 Electric Shoulder Cooler A2048300461 17609719- on 2040-parts.com
Kaunas, Lithuania
Other for Sale
- A/c fan shroud cowl fits opel vauxhall corsa c y17dtl 24426582 genuine(US $33.00)
- Genuine new land rover freelander 2 a/c ambiant temp sensor lr062632(US $)
- Sunair mc-1225 a/c compressor relief valve(US $15.59)
- No reference heating engine / Ødiameter: 145mm / 693869 for nissan patrol k/w2-(US $)
- Mack air actuator assy part # 4379-rd554144(US $35.00)
- Bmw z4 roadster e89 fresh air grill 9173538 3.00 petrol 171kw 2012 15298083-(US $)
Mandelson to announce help for car makers
Tue, 27 Jan 2009Lord Mandelson is the man charged with finding ways to fund UK Car purchases (yes, he of the dodgy mortgage debacle – at least he should know a few tricks!) as the credit crunch has dried up funding, leading to an unprecedented drop in new car sales in the UK. Mandelson is due to make a statement in the Lords just after 3pm today, outlining the help the government is going to offer to ailing car makers. Central to this package is expected to be a funding channel directly from the Bank of England to inject liquidity in to the car financing sector.
BMW Concept CS (2007) first official pictures
Thu, 19 Apr 2007By Jack Carfrae First Official Pictures 19 April 2007 07:42 BMW Concept CS - a landmark BMW concept This is the very latest offering from Munich's design studios - and it points to a bold new design future post-flame surfacing. The landmark Concept CS show car is a luxury four-door GT primed to kickstart a new look for future BMWs. The unveiling of the Concept CS marks a revolutionary shift for the marque.
GM to double size of battery lab
Mon, 12 Apr 2010General Motors says it will spend $8 million to double the size of its Global Battery Systems Lab, which the company claims is the largest and most technologically advanced automotive battery lab in the United States. GM says the expansion will speed up the development of hybrid and electric vehicles, such as the upcoming Chevrolet Volt, by improving on-site testing of battery cells and systems. When finished, the lab will be 30,000 square feet bigger than it is now, for a 63,000-square-foot total.