Mercedes Original Overload Protection Relay A2015403745 W124 W201 W126 R107 R129 on 2040-parts.com
Rural Valley, Pennsylvania, United States
Other for Sale
2011 jeep wrangler engine fuse box & relay tipm totally integrated power module(US $325.00)
1999-2002 land rover discovery 2 interior fuse box yqe000410 (3)(US $195.00)
Hks 41001-ak009 type-0 turbo timer 35th anniversary(US $94.00)
Hks 4103-rn001 turbo timer harness - fits nissan skyline r33/r34(US $18.00)
Ford f150 radio head unit(US $95.00)
Audi tt 2011 2.0l left front driver's door wire wiring harness part 8j0 971 029(US $98.00)
How will you get to work in the year 2030?
Wed, 08 Oct 2014Imagine a future where New Jersey adopts mass public transit and on-demand jitneys; Boston becomes hyper-dense and walking becomes the primary means of transport; Atlanta disperses even further and relies on solar power, electric cars and Google connected technologies to manage mobility; and Los Angeles tries autonomous cars, but finds the transition difficult, and its gridlock even worse. These are the scenarios proposed in a new study by New York University's Rudin Center for Transport Policy and Management. The report, which proposes scenarios rather than making predictions about the future of transportation in the US, repeatedly points to connected car technologies, autonomous cars and logistics networks as driving forces in regional mobility solutions.
This is the next Ferrari California T
Wed, 12 Feb 2014Ferrari revealed the California T on Wednesday, its next-generation front-engine convertible, prior to March's Geneva motor show debut. The company teased the vehicle last week. Details are scarce right now, but Ferrari says the T again has a retractable hardtop (it lowers in 14 seconds), boasts a new turbocharged V8 making 552 hp and 556 lb-ft of torque—Ferrari hasn't had a turbocharged production car since the legendary F40.
Art installation moves 100,000 toy cars an hour
Tue, 04 Mar 2014IT'S NO PICASSO, but this installation by conceptual artist Chris Burden certainly has the potential to be moving. Called Metropolis II, this amazing construction took Chris and his chief engineer four years to design and create and expands significantly on Metropolis I - the latest version has 18 roadways including one six-lane carriageway. It also has a rail network with HO-scale model trains, and running at capacity it pumps 100,000 cars around its network at a scale speed of 230mph.