Find or Sell any Parts for Your Vehicle in USA

Mercedes Ponton W180 W128 220 A S Se 1954-1960 Premium Black Loop Floor Mats on 2040-parts.com

Location:

Zuid-Beijerland, Netherlands

Zuid-Beijerland, Netherlands
Condition:New

PREMIUM BLACK LOOP FLOOR MAT SET FOR
Mercedes-Benz Ponton  W180 W128 220 a S SE 1954-1960
High quality premium German loop mat set with semi-leather heel pad for the W180/W128 lhd models.
We will ask you for exact year/model since small differences between the various model years.
PLEASE NOTE: Production time approx. 3 weeks. 


S&h rates include free insurance

All items are guaranteed mailproof packed

Combined shipping of multiple items is possible

DELIVERY TIMES:

within Europe: 4-10 working days
outside Europe: 10-15 working days

If you have any questions, please contact us

Ford C-Max (2010) MPV scooped

Thu, 03 Sep 2009

By Tim Pollard First Official Pictures 03 September 2009 09:00 CAR's scooped the new Ford C-Max, coming to a showroom near you in 2010 complete with sliding doors for the first time. Our new spyshots reveal the sliding doors on next year's C-Max, which will improve practicality for families and parents armed with buggies and carry cots. Sources suggest that the sliding doors will be reserved for a longer wheelbase seven-seater C-Max, leaving the regular car with conventional doors and five seats.

Nissan Juke Nismo RS at 2013 Los Angeles Motor Show

Thu, 21 Nov 2013

Nissan Nissan picked the Los Angeles show to reveal a pumped-up Juke Nismo RS version of its popular shrunken crossover. This is the US-spec Nismo RS and changes are likely to be made before it went on sale in the UK, according to officials in LA. The car you see here will go on sale in America in December 2013 and it's likely to jump over the Pond in 2014.

Call for reform over road repair funding

Fri, 06 Jun 2014

FUNDING patterns mean most road maintenance is being carried out in "less-efficient, cold and wet" times, a report from a Government spending watchdog has said. The current pattern of funding, combined with the need to spend money within the financial year, means that most maintenance work goes on between September and March, said the report from the National Audit Office (NAO). It went on: "Although this is less disruptive for road users, it is less efficient than carrying out the work at other times of year because materials can be more difficult to handle in cold and wet conditions, and daylight hours are shorter." The report went on: "As a result of the additional funding for emergency repairs, which is made available at the end of the financial year, almost all highways authorities need extra capacity from the market at the same time, which makes it less likely that they will get value for money." The NAO report said there was a "lack of predictability" over road spending adding that historically, local highway authorities spent more revenue on maintenance, but were now carrying out fewer routine activities such as clearing gullies which are essential to preventing water seeping into roads' sub-structure.