Mercruiser Gen Ii Water Pump Kit W/housing 817275q05 Ne on 2040-parts.com
Osprey, Florida, US
- MERCRUISER GEN II
- UPPER WATER PUMP KIT W/HOUSING AND DRIVESHAFT CARRIER W/SEALS
- COMPLETE KIT
- QUICKSILVER MARINE PARTS
- 817275Q05
- ANY QUESTIONS EMAIL questions PHONE 941-966-4320 THANKYOU FOR SHOPPING WITH US
- Visit My eBay Store: The Boating Mall
- Check out my other items!
- Be sure to add me to your favorites list!
Other for Sale
- Marine engine oil drain hose kit jabsco 180800000 boat (US $74.95)
- Marine engine trans oil utility pump jabsco 340600010 (US $54.95)
- Mercruiser upper gearhousing seal kit 26-32511a1 alpha(US $44.95)
- Marine engine oil changer drill pump jabsco 172500003(US $39.95)
- 48165a 5, reverse lock valve assembly, mercruiser 120/140 1967-1969(US $49.99)
- Faria 0-80 psi oil pressure gauge 13002(US $24.64)
Hyundai names former GM exec Shannon as U.S. marketing boss
Thu, 07 Apr 2011Hyundai has tapped a General Motors veteran as its new U.S. marketing chief, filling a spot that has sat empty for more than seven months. Steve Shannon was named vice president of marketing for Hyundai Motor America on Wednesday and will officially take his position on April 18, Hyundai spokesman Chris Hosford said.
Top Gear Series 19: Video trailer & 1st episode details
Sat, 19 Jan 2013Series 19 of Top Gear returns to BBC 2 on 27th January, and we have a video trailer and details of the first episode. It’s been a bit odd without Top Gear on our screens (well, new Top Gear episodes), but normal service will resume on 27th January as series 19 of Top Gear returns to BBC2. Ahead of the first episode of series 19 (there will be seven episodes in total), the Beeb is making sure we know there’s a new Top Gear series coming with a short video trailer, and the BBC has also sent us details of the first episode.
Green Light For More Smart Motorway Schemes
Wed, 09 Jul 2014THE Government has announced plans to speed up journey times on selected parts of the nation’s motorway network. As a result, work will start to convert the hard shoulder into a running lane on two sections of the M1 and on a stretch of the M3. The M1 work will be between junctions 28 and 31 in Derbyshire and between junctions 32 and 35a in South Yorkshire, with claims that it will boost capacity by up to a third and improve journey times by up to 10%.