Mercruiser Piston Assy 260-305 .030 735-9705 Sir 18-4178 on 2040-parts.com
Watertown, Massachusetts, United States
new sierra replacement piston 18-4178 .030 oversize with piston rings replaces mercruiser 735-9715 fits 260 & 305 as shown note I have I more to sell
|
Internal Engine Parts for Sale
- Volvo penta bearing set 3852802-2 5.8 litre omc 0775837(US $29.99)
- Mercruiser 170 190 470 3.7 camshaft 4627-416(US $150.00)
- Volvo penta md1b md2b md3b aqd2b d1 d2 d3 decarb set replaces 876377(US $57.67)
- Head gasket set for volvo penta aq125b aq131 aq145b aq151 230 replaces 876302(US $151.49)
- Mercruiser new oem oil dipstick gauge 861942t7; 861942t 7(US $13.94)
- Volvo penta kad42 kad43 kad44 tamd41 & more oil pan gasket replace 861251 860685(US $30.29)
Top 5 of everything at the Frankfurt motor show
Wed, 16 Sep 2009Frankfurt motor show: the hits and misses, the glamour and grit By Ben Whitworth Motor Shows 16 September 2009 17:21 The top trends at Frankfurt motor show 2009 1. Carbonfibre. From the tub in the oddball Volkswagen L1 to the wing mirrors of the Mercedes SLS, the glossy black woven stuff, both real and fake, is everywhere.2.
Londoners 'most likely to fail' driving test
Mon, 21 Jul 2014LEARNERS gearing up to take their first driving test are twice as likely to pass in Scotland as those in London, according to analysis of driving test results by a car insurance company. Its analysis reveals that London has the test centres with the four lowest pass rates in the country for first time test-takers. Only 31% of learner drivers in Belvedere passing the first time, while Wanstead (32%), Barking (32%) and Wood Green (33%) were the other lowest scoring centres in the capital, all with first time pass rates significantly below the national average (48%), the study by Privilege Car Insurance found.
Camaro plant gets more work; recall issued
Thu, 07 May 2009The strong early demand for the Chevrolet Camaro has General Motors looking to crank more units out of the Oshawa, Ontario, assembly plant. The Oshawa plant was exempt from GM's recent announcement of shutdowns of as long as nine weeks for several of its plants--primarily those that build pickups and SUVs. Oshawa will increase Camaro output by adding overtime and an extra week to the plant's production schedule.