Mercury 135 150 175 200 Hp 2 Stroke Outboard 25" Xl Lower Unit Gear Case 2:1 Rh on 2040-parts.com
Alvin, Texas, United States
Complete Outboard Lower Units for Sale
- Yamaha lower unit 50 2 stroke(US $200.00)
- Yamaha lower unit 50 4 stroke(US $200.00)
- Clean used oem mercury 2/3 cyl 1977-1997 35-70 hp 20-inch outboard lower unit(US $369.99)
- 2013 & later honda 200 225 250 hp remanufactured lower unit with 1 year warranty(US $2,600.00)
- 1988 mariner / yamaha 30 hp 2 stroke long shaft lower unit gear case(US $280.00)
- 1990 88 hp 90 115 hp v4 lower unit 20" johnson evinrude omc works great(US $400.00)
Pagani Zonda F Cinque – er, no it’s not!
Fri, 06 Mar 2009The mysterious 'Zonda F Cinque' - which is actually a Regular Zonda Cinque But we are still to see the Zonda Cinque (which is essentially a tamed-down Zonda R for the road) in the wild, and probably because of that the car sites around the world were full of a mysterious ‘Zonda F Cinque’ that was going to turn up at the Geneva Motor Show. But we had our doubts. We have pretty good contacts at Pagani, and although we knew that the Pagani coming to Geneva was in fact the Cinque (as well as the Zonda R) we wanted to work out where the rumour came from.
Jaguar Land Rover factory closure
Thu, 24 Sep 2009Jaguar Land Rover are to close one of their production facilities in the Midlands JLR unions have already brokered a deal to ensure no job losses in the short term, but JLR are committed to rationalising their manufacturing across just two plants in the UK, instead of the existing three. The decision will be made about which plant to close in the next eighteen months. The most likely scenario is that JLR will close Solihull – which currently produces Land Rovers and employs 5000 people – and concentrate Land Rover production at Halewood.
Nissan UK Battery plans confirmed
Mon, 20 Jul 2009Nissan - the Renault Nissan Alliance - has confirmed plans for car battery production in the UK and Portugal The aim of the battery production plants is to supply batteries for electric cars built by the Renault Nissan alliance, but Nissan haven’t actually said that they will build any electric cars in the UK. Hmm. The target production is 60,000 annually to be used in a range of Nissan and Renault electric cars that will start to hit the market next year (2010) – in the US and Japan – with full global roll-out by 2010.