Mercury 2018 250 Pro Xs 20” Torque Master Gen2 Lower Unit 1 1/4 Shaft on 2040-parts.com
Spokane, Washington, United States
Complete Outboard Lower Units for Sale
Parts only complete lower gear case 50hp force(US $299.00)
Lower unit 1969 evinrude 50 hp long shaft(US $299.00)
Used oem nissan / tohatsu 3-cyl 70-90 hp 2-stroke tldi 20"outboard lower unit(US $749.00)
Brand new oem mercury 2011-up 150 hp 4-cyl 4-stroke 20-inch outboard lower unit(US $2,150.00)
Mercury outboard 1600-880686t24 verado gear housing assembly complete 25" xl(US $6,980.00)
Yamaha outboard 25" two stroke lower unit gearcase 150hp 200hp(US $750.00)
Fiat 500 Colour Therapy added to UK 500 range
Fri, 10 Aug 2012Fiat has added the 500 Colour Therapy – a retro-look Fiat 500 – to the model range in the UK. The Fiat 500 belongs to the same school of marketing as the MINI, so a new trim range to cash in on its ‘Homage to an Icon’ status seems an obvious route to garner a few more sales for the very likeable 500. Which is why the UK is getting the Fiat 500 Colour Therapy, a new model range that sits in the 500 line-up between the Pop and Lounge trim levels and comes in five retro-inspired colours - New Age Cream, Countrypolitan Yellow, Pasodoble Red, Volare Blue, and Tech House Grey.
Hyundai Genesis gets Detroit 2014 debut
Tue, 14 Jan 2014Cars we don’t get in the UK 101 would have to include the Hyundai Genesis American-market saloon in its syllabus. It’s an upmarket barge of a car that we actually wouldn’t mind gracing our roads over here in Blighty – and, interestingly, the new car is destined for these shores. Think of it as a cut-price Jaguar XF or BMW 5 Series over in the States, offering loads of comfort, a decent turn of performance and plenty of neat safety features.
$5 billion competition on to replace Humvee
Mon, 04 Jun 2012Competition is heating up to win a contract for a vehicle that will replace nearly 18,500 aging military Humvees for the U.S. Army and Marine Corps starting in 2015. Six proposals are in play, with little time left before federal contracting officials decide on development of the $5 billion-plus program.