Mercury Mercruiser Weber Carburetors Used 1992-1997 454 Magnum Mercruiser Engine on 2040-parts.com
Bayport, New York, United States
Intake & Fuel System for Sale
Marine flame arrester, 4-barrel carburetor, volvo mercruiser omc
Mercruiser 4.3 flame arrestor for 4 barrel carburetor 805298 v6 carb 4.3lx
Omc cobra 2.3 ford oil filler cap 984646 1989 2.3l(US $20.00)
Omc cobra 4.3 throttle cable bracket linkage lever 910469 910533 982698 913563(US $50.00)
Volvo penta aq 130 intake manifold 1-824647 aq130 4 cylinder(US $50.00)
Omc 981911 fuel filter canister stringer 200-260 hp, 3.8-5.7l(US $24.99)
BMW 640d xDrive announced
Fri, 24 Feb 2012On Thursday, Greg Kable waxed effusively about the new BMW M550d xDrive coupe, suggesting that it was the ultimate 5-series for everyday use. On Friday, Munich announced that the 5's two-door sibling will receive an AWD diesel variant: the 640d xDrive. While not quite as high-zoot as the 5-series' top oil burner, the 640d's 3.0-liter, twin-turbo straight-six cranks out a respectable 465 lb-ft of almighty torque between 1,500 rpm and 2,500 rpm, plus 313 hp at 4,400 rpm—numbers that, according to BMW, will carry the 6-series to 60 mph in 5.2 seconds.
Peugeot Ramps Up Production For New 308
Tue, 18 Mar 2014FRENCH car maker Peugeot is to crank up production of its new 308 model as demand has rocketed for the recently crowned 2014 European Car of the Year. Built at Peugeot’s Sochaux plant in France, the firm has announced it’s to add a night shift from June, with the result that 600 jobs are being created and output will increase to a total of 1,563 cars per day. The firm has said it has already taken over 60,000 orders, while the decision to up production coincides with the launch this summer of an estate version, the 308 SW.
Ford Design Center set to expand
Wed, 13 Apr 2011Symbolic of the importance it plays in Ford's small car strategy, the automakers Design Center in Cologne, Germany, is about to receive a €11.6m redevelopment. Construction is already underway on the facility's new wing, which will include design studios and 100 workplaces. The 3,000 square-meter extension is set to be completed by the end of the year.