Find or Sell any Parts for Your Vehicle in USA

Monroe Dx652 Brake Pad Or Shoe, Front-monroe Dynamics Brake Pad on 2040-parts.com

US $48.42
Location:

Salt Lake City, Utah, US

Salt Lake City, Utah, US
Returns Accepted:Returns Accepted Refund will be given as:Money Back Item must be returned within:14 Days Return policy details:Items must be returned in original packaging in salable condition. Any item that has been installed can not be returned. Refunds will be issued once the merchandise is received. Return shipping will be paid by:Buyer Restocking Fee:No Part Brand:MONROE Manufacturer Part Number:DX652 SME:_2316 Placement on Vehicle:Front UPC:00048598973658 Product Description - Abbreviated - 12:BRAKE PD AAIA Part Type Description:DISC BRAKE PAD Product Description - Long - 80:MONROE DYNAMICS BRAKE PAD Product Description - Extended 240:MONROE DYNAMICS BRAKE PAD Key Search Words - 80:MONROE DYNAMICS BRAKE PAD Product Description - Short - 20:MONROE BRAKE PD

New Mazda3 MPS – UK Details

Thu, 03 Sep 2009

The new Mazda3 arrives in the UK on 1st October Mazda has chosen to have just one MPS model which will come in at £21,500 otr. And the spec is good, including Bluetooth, surround-sound BOSE, a new MID (multi information display) with a compact satellite navigation system that uses a high-resolution 11 cm (4.1 inch) screen mounted in the dashboard’s upper section and auto dual zone climate control air conditioning. Not too shoddy at all.

2011 Vauxhall Corsa facelift

Wed, 24 Nov 2010

The Vauxhall Corsa 2011 Facelift Vauxhall – and Opel too – obviously don’t want to do too much to the Corsa at once. This time last year we had engine upgrades for the 2010 Corsa – and some economy tweaks and fiddles – but nothing in the way of cosmetic changes. This year we get no oily tweaks but we do get the 2011 Vauxhall Corsa Facelift.

GM delays second shift at Volt plant

Fri, 07 Oct 2011

General Motors is delaying the addition of a second shift at its Michigan assembly plant that makes the Chevrolet Volt. In May, GM said that it would add a second shift at its Detroit-Hamtramck plant by late this fall to double Volt production. Instead, a plant overhaul completed this summer, along with a more-modest addition of workers, will allow GM to double production starting early next year while remaining on one shift, the company said Friday.