Moose Top End Gasket Kit Fits Honda Xl 80 S Xl80 S 1980-1985 on 2040-parts.com
Tempe, Arizona, US
Components for Sale
- Cb700 cb 700 cylinder head acorn nut & washer 1984 1985 1986 nighthawk(US $2.75)
- Yamaha xv 535 cylinder head gasket 3bt-11196-00-00 see years in description(US $10.00)
- Xs650 tx650 set of 7 valve tappet screws with jamb nuts great condition(US $29.00)
- Suzuki rm 250 2003 radiator fill side right 2001-2008 rm 125/250(US $21.59)
- Ktm oil filters 3 pack set dt1 2008-12 450 505 530 sxf xcw three new filters(US $18.00)
- Suzuki rm 250 connecting rod kit 1996-2002 oem(US $76.99)
Nissan Qashqai 2010 – First photos UPDATE: Models and Prices
Fri, 04 Dec 2009The Facelifted 2010 Nissan Qashqai Updated at the bottom with full Price and model detail for 2010. Last month we revealed that the 2010 facelift for the Nissan Qashqai was actually running ahead of the original plan, and instead of a Summer launch as we first thought, Nissan now plans to have the 2010 Qashqai on the roads in March. We reckoned that Nissan would release first details on the facelifted Qashqai early this month, so we’re pleased to see that we were bang on the money with the first pictures of the 2010 Qashqai dropping in to our inbox this morning.
2009 Mazda 3 hatchback unveiled ahead of Bologna
Tue, 25 Nov 2008Mazda has today released the first pictures of the new Mazda 3 hatchback, ahead of the Bologna Motor Show on December 3rd. The pictures come hot on the heels of the recently announced saloon and, just like the saloon, the Mazda 3 hatchback is a much fresher design, with far more sporty pretensions. One of the big aims for Mazda with the 3 was, of course, a much more economical car without sacrificing the old model’s strengths.
Mexico plant to build Honda Fit for U.S. market
Thu, 29 Mar 2012Honda Motor Co. has confirmed it will build its Fit small car at its new plant in Mexico for export to the United States and other markets, as it expands its local production footprint to combat the Japanese yen's profit-eating strength. The plant, near Celaya, Guanajuato, will begin operation in 2014 with a capacity of 200,000 vehicles a year.