Motorad Oil Filler Cap For 2007 Gmc Sierra 3500 Classic Engine Cylinder Um on 2040-parts.com
Indianapolis, Indiana, United States
Oil Filler Caps for Sale
- Motorad oil filler cap for 1992-1993 mercedes-benz 400e engine cylinder us(US $9.56)
- Škoda rapid nh engine oil measuring rod 04e115611r, original part-(US $)
- Genuine mopar oil filler cap 5047702ab(US $29.45)
- Škoda rapid nh engine oil measuring rod 03e115611d, original part-(US $)
- Motorad crankcase breather cap for 1967 chevrolet camaro engine emission de(US $9.98)
- 3001047 dipstick fit cummins engine k19 k38 nt855(US $59.96)
BMW: Carbon fiber goes high volume in 2013
Tue, 12 Jul 2011BMW AG plans to begin high-volume production of carbon fiber parts in two years, making it a strong contender to be the first automaker to move beyond limited-edition use of the exotic material. But Daimler AG, which has taken steps aimed at making carbon fiber parts in 2012, is among the automakers racing toward the same goal. In 2013, BMW will start building the i3 electric car, a vehicle that features a passenger cell--the protective shell around the passenger compartment that ensures the integrity of the vehicle in a crash--made of plastic reinforced with carbon fiber.
Mercedes Shooting Break concept (2010)
Mon, 19 Apr 2010By Tim Pollard First Official Pictures 19 April 2010 23:00 Mercedes is this week – volcanic ash cloud notwithstanding – due to unveil this new Shooting Break concept car at the 2010 Beijing auto show. It's a barely disguised show version of a sporting CLS estate. Think a Mercedes wagon for picky types who find the E-class Estate a tad too sensible.Stuttgart is being unusually candid about this car's provenance, sprinkling the press kit with hints that this will join the next CLS family as a sporty, crossover coupé-estate.
July 9: Keeping it topped off
Fri, 09 Jul 2010As expected, when I walked back to my parking space at VSP parking across the street from Burbank Airport the i-MiEV was fully charged. No problem. It had more than 24 hours to get charged and it can't take more than 16 hours to do it, if you figure one hour per kWh at 120 volts.