Find or Sell any Parts for Your Vehicle in USA

N02-2085i40jc 20x8.5 5x112 5x4.5 (5x114.3) Wheels Rims Chrome +40 Offset Alloy on 2040-parts.com

US $933.90
Location:

Saint Charles, Illinois, United States

Saint Charles, Illinois, United States
Condition:New Brand:2Crave Offset:40 Manufacturer Part Number:N02-2085I40JC Hub Bore:74.10 Placement on Vehicle:Left, Right, Front, Rear Model:N02 Surface Finish:Chrome Partnumber:N02-2085I40JC Size:20x8.5

Other for Sale

Smart Forfour (2015): first official photos

Wed, 16 Jul 2014

By James Clark First Official Pictures 16 July 2014 19:30 The Smart ForFour is back - and this time it's twinned with the new, rear-engined Smart ForTwo rather than a bitsa Mitsubishi. The second-generation Smart ForFour was unveiled at an event in Berlin tonight, and marks the return of Daimler to the affordable family hatchback segment. With weak sales and an indistinct DNA, the first Smart ForFour was a sales flop and lasted only a couple of years.

Nissan 370Z Roadster Goodwood Revival debut

Fri, 18 Sep 2009

The Nissan 370Z Roadster gets its first public airing in the UK at the Goodwood Revival. The new 370Z Roadster gets the same 3.7 litre V6 as its Coupe sibling, with either a short ratio six-speed manual ‘box or a seven-speed auto. The 370Z also comes equipped with Nissan’s ‘SynchroRev Match’ which matches revs to cogs to give you a seamless change.

Toyota's quake-hit Yaris plant offline for at least another month

Wed, 30 Mar 2011

Toyota's quake-hammered Miyagi assembly plant, which makes the Yaris small car for export to the United States, is expected to be offline for at least another month. Workers have completed repairs at the factory and restored electricity, but the facility cannot get supplies of natural gas, a person familiar with the situation said. The assessment underscores the long road facing Toyota and other Japanese automakers in bringing plants back into full operation following the deadly quake, which killed more than 11,000 people, ruptured gas lines, shutdown electric grids and snarled logistics across half the country.