Oil Filters for Sale
- 2324300 oil filter for » others. premium 370.26 g 6x2 2389591 2389591-(US $)
- Hastings heavy duty filter lf142 engine oil filter(US $12.99)
- G4d3-6714-a bracket oil filter engine jaguar xf 2.0 d 4x4 132kw aut 4p (2017)-(US $)
- Purolator boss engine oil filter for 2005-2007 pontiac wave5 oil change jc(US $20.26)
- Stp s8081(US $11.00)
- Purolator boss engine oil filter for 2014-2019 infiniti qx80 oil change lr(US $19.24)
Toyota Prius V MPV debuts
Mon, 10 Jan 2011The Toyota Prius V - a Prius MPV with more luggage space We knew Toyota were planning on growing the Prius family. We also knew that the next stage of that was going to be an MPV, or at least a more Cossover type of car. We did think it would be the Prius Alpha.
BMW 3 Series GT revealed
Thu, 07 Feb 2013The BMW 3 Series Grand Turismo – the third model in the BMW 3 Series range – has been revealed ahead of a public debut at the Chicago and Geneva Motor Shows. Now, BMW has revealed a little brother for the not exactly super successful 5 Series Grand Turismo, in the guise of the new BMW 3 Series GT, a slightly ungainly looking 3 Series that’s almost as big as a 5 Series and will cost around £3,000 more than the 3 Series saloon. Stretched by 110mm in the wheelbase from the 3 Series Touring – and a full 200mm longer – the 3 Series GT will, say BMW, offer the dynamics of the saloon with the practicality of the Touring.
Call for reform over road repair funding
Fri, 06 Jun 2014FUNDING patterns mean most road maintenance is being carried out in "less-efficient, cold and wet" times, a report from a Government spending watchdog has said. The current pattern of funding, combined with the need to spend money within the financial year, means that most maintenance work goes on between September and March, said the report from the National Audit Office (NAO). It went on: "Although this is less disruptive for road users, it is less efficient than carrying out the work at other times of year because materials can be more difficult to handle in cold and wet conditions, and daylight hours are shorter." The report went on: "As a result of the additional funding for emergency repairs, which is made available at the end of the financial year, almost all highways authorities need extra capacity from the market at the same time, which makes it less likely that they will get value for money." The NAO report said there was a "lack of predictability" over road spending adding that historically, local highway authorities spent more revenue on maintenance, but were now carrying out fewer routine activities such as clearing gullies which are essential to preventing water seeping into roads' sub-structure.