Find or Sell any Parts for Your Vehicle in USA

New Disc Brake Caliper Bushing on 2040-parts.com

US $16.93
Location:

ON, CA

ON, CA
Returns Accepted:Returns Accepted Item must be returned within:30 Days Return policy details:See our Customer Service Policies on our eBay Store Refund will be given as:Money Back Return shipping will be paid by:Buyer Restocking Fee:No Location:Front,Rear Fitment:See our fitment note table below the eBay fitments Placement on Vehicle:Array Manufacturer Part Number:HW26418 Part Brand:Prime Choice Auto Parts

The 10 Best Summer Vacation Cars, an AW List

Thu, 27 May 2010

Memorial Day is the first long weekend during which car fans can get out and hit the open road. Whether you want to take an “I just won the lottery” trip or a “Let's just get outta here” trip, AutoWeek has you covered. First, the dream road-trip cars and some dream trips, then some practical ideas.

Lincoln introduces Black Label trim at Pebble Beach

Thu, 15 Aug 2013

Lincoln introduced its hoity-toity Black Label Collection at Pebble Beach on Thursday. In the words of Jim Farley, “The new Lincoln Motor Company is built on three foundational elements -- design, quality and personal service; Black Label represents our highest expression of these elements.” Lincoln says its Black Label dealers will collaborate to create a personal, integrated client shopping and ownership experience, with respect for the luxury of time. We're not sure exactly what that means, but if the dealers can pick up the cars for gas, a wash and some fast food, that would be great.

BID TO SLOW TRAFFIC ON M3 STRETCH

Fri, 14 Feb 2014

FIRST it was a stretch of the M1 and now the same speed reduction plan has been announced for a stretch of the M3 motorway in Surrey and Hampshire. The Highways Agency (HA) has proposed that a three-mile section of the M3 between junction 3 at Lightwater in Surrey and junction 4 near Farnborough in Hampshire be subject to a 60mph restriction. This section is part of a 13.4-mile stretch that is being upgraded in a £174 million scheme, with the 60mph proposal, to operate between 7am and 7pm daily so air quality levels can be met.