New Dorman Lateral Arm, 523-127 on 2040-parts.com
Memphis, Tennessee, United States
Control Arms & Parts for Sale
- Moog rk640323 lower control arm(US $71.23)
- Moog k90061 lower control arm bushing or kit(US $34.19)
- Moog rk80546 control arm with ball joint(US $79.35)
- Moog rk621233 control arm with ball joint(US $104.09)
- Moog rk621349 control arm with ball joint(US $107.79)
- Moog rk621356 control arm with ball joint(US $228.91)
2013 Kia Carens price & specification. Costs from £17,895.
Thu, 25 Apr 2013That’s a subjective call, but the new Carens is a decent looking effort from Kia at a sensible price point with decent equipment levels and offers plenty of family lugging abilities in to the bargain. All Carens models in the UK come with 7 seats and yet is 20mm shorter than the old Carens, But thanks to an extra 50mm in the wheelbase Kia reckons it offers all the space if bigger rivals and, with a flexible configuration for the seating, means the new Carens can accommodate the needs of a mix of load and people carrying with alacrity. The new Carens comes in three trim levels – catchily named 1, 2 and 3 – with 7 seats, cornering lights LED running lights, electric heated door mirrors, AirCon, electric windows, Cruise, Radio/CD with iPod connectivity and Bluetooth and a rear conversation mirror.
Automakers should disable technologies that distract drivers, U.S. says
Fri, 17 Feb 2012The U.S. Department of Transportation on Thursday released its long-awaited guidelines on distracted driving, calling on automakers to disable applications that allow drivers to manually access social media, surf the Web or send text messages while on the road. The recommendations also seek to prevent any in-car technologies that require drivers to use both hands or take their eyes off the road for more than two seconds.
$5 billion competition on to replace Humvee
Mon, 04 Jun 2012Competition is heating up to win a contract for a vehicle that will replace nearly 18,500 aging military Humvees for the U.S. Army and Marine Corps starting in 2015. Six proposals are in play, with little time left before federal contracting officials decide on development of the $5 billion-plus program.