Find or Sell any Parts for Your Vehicle in USA

New Gm Oem Tire Pressure Sensor Silverado Sierra Yukon Tahoe Escalade Suburban H on 2040-parts.com

US $30.00
Location:

Apple Valley, California, US

Apple Valley, California, US
Returns Accepted:ReturnsNotAccepted Other Part Number:13586335

NEW GM FACTORY OEM TIRE PRESSURE SENSOR MONITOR ONLY...MUST PURCHASE VALVE STEM AND CAP SEPERATLEY.........GM PART NO 20923680  ..REPLACED BY NEW NO.13586335...DLR LIST  PRICE $ 72.00 EACH ...WILL WORK IN MANY 2006-2012 MODEL YEARS INC....

CHEVROLET SILVERADO, TAHOE, SUBURBAN, AVALANCHE, COBALT, GMC SIERRA,


 

YUKON, YUKON XL, CADILLAC ESCALADE, ESCALADE ESV, DTS, HUMMER H2, AND OTHERS..Thanks for looking !!!!

Posted with eBay Mobile

Pumped up Chevy previews new Lacetti

Thu, 07 Sep 2006

By Phil McNamara Motor Industry 07 September 2006 08:47 Chevrolet has issued this sneak preview of its forthcoming family hatch – disguised as a World Touring Car. Disregard the pram handle wing, snowplough undertray and steroidal wheelarch extensions, and you have the car to replace the current Lacetti in around 2008. The production model should use GM's next-generation Delta platform, which will also underpin the next Astra and a proposed Saab hot hatch.

The Acura NSX at 25

Fri, 02 May 2014

On Feb. 10, 1989, executives from Honda and a newly founded division known as Acura piled into a conference room in Chicago's historic Drake Hotel to rehearse the unveiling of an unbelievable new car -- a Technicolor vision for the future, something never before built by Honda or any Japanese automaker. As the public relations department went over its lines, Tadashi Kume, then-president of Honda and an instrumental figure in Honda's Formula One efforts, presided.

London underpass to hold flood water

Mon, 10 Feb 2014

A PEDESTRIAN UNDERPASS is to be turned into an emergency pond to hold hundreds of thousands of litres of floodwater threatening homes and businesses in south London. The Purley Cross underpass will be used to hold water pumped from around 400 under-threat buildings in parts of Kenley and Purley and to stop a water treatment works which supplies tens of thousands of homes from flooding, Croydon Council said. The authority said the plan to use the underground footway to hold around 600,000 litres of water from tonight was approved after its "primary" pond at Purley Depot overflowed last night.