Find or Sell any Parts for Your Vehicle in USA

New Infiniti Oem G37 Coupe 2008-2013 Steering Trim Bezel Black W/ Tech Pkg on 2040-parts.com

US $27.50
Location:

Vienna, Virginia, US

Vienna, Virginia, US
Item must be returned within:14 Days Refund will be given as:Money Back Return shipping will be paid by:Buyer Restocking Fee:No Returns Accepted:Returns Accepted Return policy details:Item has to be in original box with all original un damaged labels. Item can not be installed or damaged. We are not responsible for shipping damages.

NEW IN BOX

Factory Steering Trim bezel W/ Tech Package

Black

2008-2013 G37 Coupe

Inquire about interior color, Send us your VEHICLE IDENTIFICATION NUMBER VIN so we can accurately give you the correct interior trim color for your specific vehicle

U.S. SHIPPING ONLY TO LOWER 48 STATES - NO INTERNATIONAL SHIPPING! -VA RESIDENTS PAY 5% SALES TAX

Futuristic, self-balancing Gyro-X to be restored

Wed, 27 Feb 2013

Alex Tremulis was an eclectic visionary who saw the future in swoops, curls, bubble tops, and hand-formed metal. At the precarious age of 19, without any training, he landed at Cord Automobile and helped develop the legendary Model 810. In the 1940s he penned the Tucker and the Chrysler Thunderbolt.

Jensen to build new Interceptor in 2014

Tue, 20 Sep 2011

These are the first renderings of the all-new Jensen Interceptor, due in 2014. Not to be confused with the 'new' old Interceptor, you can still buy. Coventry automotive specialist CPP will build the new 2014 Jensen Interceptor at its West Midlands plant; it'll also engineer and develop the prototypes.

BID TO SLOW TRAFFIC ON M3 STRETCH

Fri, 14 Feb 2014

FIRST it was a stretch of the M1 and now the same speed reduction plan has been announced for a stretch of the M3 motorway in Surrey and Hampshire. The Highways Agency (HA) has proposed that a three-mile section of the M3 between junction 3 at Lightwater in Surrey and junction 4 near Farnborough in Hampshire be subject to a 60mph restriction. This section is part of a 13.4-mile stretch that is being upgraded in a £174 million scheme, with the 60mph proposal, to operate between 7am and 7pm daily so air quality levels can be met.