Find or Sell any Parts for Your Vehicle in USA

New Lot/2 Lil' Auto Store Stop Tail Turn Service 3156 Light Bulb Wedge Base on 2040-parts.com

US $0.99
Location:

Cincinnati, Ohio, US

Cincinnati, Ohio, US
Restocking Fee:No Returns Accepted:Returns Accepted Item must be returned within:14 Days Refund will be given as:Money back or exchange (buyer's choice) Return shipping will be paid by:Buyer Return policy details:Restocking fee: No Manufacturer Part Number:L3156 Part Brand:ACDELCO OE SERVICE SME:_2889

Brand new/old stock!

Posted with eBay Mobile

Ferrari FF & Jensen FF together in the snow of St Moritz (video)

Mon, 06 Feb 2012

Two FFs 40 years apart - the Jensen FF & Ferrari FF Classic Driver has taken the Jensen FF and Ferrari FF to St Moritz to see what forty years of car development means for two 4WD Supercars. St Moritz lies in the Engadine valley in Switzerland and is a winter wonderland playground for the rich, so what better place to take a pair of stunning four-wheel-drive supercars to play than this? Which is why Classic Driver chose St Moritz to take the Jensen FF and Ferrari FF for a (not too close) comparison of what forty years of supercar development means.

Mercedes AMG engine guru to join VW

Fri, 18 Jan 2013

The man credited with development of Mercedes-Benz AMG's latest line of high performance gasoline engines, Friedrich Eichler, has been lured to the Volkswagen Group, where he will take up an as yet unspecified position this summer, sources with knowledge of the move tell Autoweek. Eichler, who joined AMG after working his way up through the ranks at Porsche, was instrumental in the development of AMG's naturally aspirated 6.2-liter V8, twin-turbocharged and naturally aspirated 5.5-liter V8 and twin-turbocharged 6.0-liter V12 that powers the Pagani Huayra. Friedrich Eichler also developed turbocharged four-cylinder engines for upcoming Mercedes AMG cars.

Britain to be third global production site for the Nissan Leaf EV after Japan, U.S.

Thu, 18 Mar 2010

Nissan Motor Co. said it will build the new Leaf electric vehicle at Britain's Sunderland assembly plant starting in early 2013, with initial capacity of 50,000 units. The Japanese company and its French alliance partner Renault will invest more than $642.6 million in the project, including the construction of a lithium ion battery plant on the site.