Find or Sell any Parts for Your Vehicle in USA

New Mercury Oem Hydraulic Trim Hose Part # 32-846427 on 2040-parts.com

US $50.00
Location:

Beverly, New Jersey, United States

Beverly, New Jersey, United States
New hose packaging is looking ruff from sitting on shelf for a long time.
Brand:Mercruiser Country/Region of Manufacture:United States Manufacturer Part Number:32-846427

 

BRAND NEW MERCURY  HYDRAULIC TRIM HOSE OEM PART NUMBER

32-846427

 Package may look ruff sitting a long time on parts shelf hose is never being used.


THIS HYDRAULIC TRIM HOSE IS USED IN MERCURY RACING SUPER SPEEDMASTER TRANSOM ASSEMBLY AS WELL AS THE NXT TRANSOM. PLEASE CONFIRM THIS WILL FIT YOUR APPLICATION BEFORE PURCHASE.

Vauxhall GTC Paris concept (2010) first pictures

Thu, 23 Sep 2010

By Ben Pulman First Official Pictures 23 September 2010 23:01 This rather lovely red beauty is the Vauxhall GTC Paris concept, and our first look at how 2011’s new three-door Astra will look. But you know that because Vauxhall released the first pictures of this car back in early September – the reason we’re revisiting it is that we’ve now got a chance to glimpse inside the GTC Paris.Vauxhall GTC Paris? So it’s exactly what is says on the tin?That’s right – this is Vauxhall’s latest concept car, and it will be unveiled on 30 September at the 2010 Paris motor show.

Concours d'LeMons: Living a different kind of automotive lifestyle

Thu, 10 Sep 2009

The “winner” was perhaps the worst car I'd ever seen. The 1980 French KV Mini looked like something made in a backyard by a 10-year-old. This thing was not going to pass government standards in any country in the world.

BID TO SLOW TRAFFIC ON M3 STRETCH

Fri, 14 Feb 2014

FIRST it was a stretch of the M1 and now the same speed reduction plan has been announced for a stretch of the M3 motorway in Surrey and Hampshire. The Highways Agency (HA) has proposed that a three-mile section of the M3 between junction 3 at Lightwater in Surrey and junction 4 near Farnborough in Hampshire be subject to a 60mph restriction. This section is part of a 13.4-mile stretch that is being upgraded in a £174 million scheme, with the 60mph proposal, to operate between 7am and 7pm daily so air quality levels can be met.