New Oem Alternator/mount Bracket 99-09 Volvo C70 S40 S60 S70 S80 V70 V70xc Xc90 on 2040-parts.com
Cranston, Rhode Island, US
Other for Sale
- Porsche 928 1978-1984 alternator air duct (oem) porsche (sev alt.) 3 pcs,(US $40.00)
- Tuff stuff silver bullet alternator 100 amps chrome plated 12v gm 10si case(US $146.97)
- Omix-ada 17228.03 - 76-80 jeep cj starter coil field(US $44.99)
- Chevy trail blazer new alternator 03 04 5.3l high amp(US $119.99)
- Tuff stuff replacement alternator 150 amps chrome plated 12v ford 3g case 7764a(US $219.97)
- Reman oem 1996-2000 dodge caravan, plymouth voyager 3.0l v6 starter(US $49.99)
Lexus LF-A still on the cards
Thu, 01 Jan 2009With the car world in turmoil, and buyers running scared of high performance cars, most of the car makers around the world are shelving their high-end projects until things settle down. Honda has announced that it has put its NSX replacement on ice (although it is apparently still going to show it at Detroit) and other manufacturers are concentrating on their frugal products. But Toyota is taking a different tack.
Meet the 214-mpg Volkswagen Twin-Up concept
Fri, 08 Nov 2013Ahead of a Tokyo motor show debut, VW is showing off the Twin-Up concept. Essentially an advanced version of the company's entry-level Up supermini, the Twin-Up runs a modified version of the plug-in diesel-electric hybrid driveline used in the high-tech XL1 for spectacular claimed combined consumption of 214 mpg on the Euro combined cycle along with a zero-emissions electric range of 31 miles. The Twin-Up name alludes to the new car's twin drive sources.
Aston Martin to axe a third of jobs
Mon, 01 Dec 2008Aston Martin today announced 600 potential redundancies. It is consulting with the unions to lose 300 permanent jobs and 300 temporary staff By Tim Pollard Motor Industry 01 December 2008 14:00 Aston Martin announced at 2.00pm today that it is to cut a third of its UK workforce in a response to a slump in sales. The company, based in Gaydon, Warwickshire, said it today launched a consultation with the unions to cut 300 permanent jobs and 300 temporary posts – out of a total of 1850 employees.