Find or Sell any Parts for Your Vehicle in USA

New Oem Quicksilver Mercury Mercruiser 87-86320a 7 Harness Extension Merc30 on 2040-parts.com

US $17.99
Location:

Sandusky, Ohio, United States

Sandusky, Ohio, United States
Condition:New Brand:QUICKSILVER Manufacturer Part Number:87-86320A7

NEW OEM QUICKSILVER MERCURY MERCRUISER 87-86320A 7 HARNESS EXTENSION MERC30

The item your bidding on is new old stock. Please verify your part number before purchasing.

First Sight: BMW 4 Series

Mon, 17 Jun 2013

Within BMW, it was an ongoing discussion for two decades: what to call the coupé version of the 3 Series? With the new model pictured here, the advocates of change got it their way. The proliferation of models most likely tipped the scales – besides the 3 Series sedan, there is the Touring, the 'Gran Turismo' and the China-only long-wheelbase version.

Hooniverse explores BMW 5-series weight gain

Fri, 05 Oct 2012

Our friends at Hooniverse have put together an interesting and insightful perspective on the growth of the BMW 5-series from the E28 to the new F10. Despite putting on more than 1,000 pounds, the F10's performance and fuel economy is still respectable. Overall length is up, but the interior space remains largely unchanged.

Lamborghini CO2 reduction Press Release

Sun, 07 Jun 2009

Lamborghini CO2 Reduction Press Release • The construction of a large photovoltaic plant, combined with an energy-saving project, will achieve a 30% reduction in the factory’s CO2 emissions by 2010 • Modifications to vehicles will result in a 35% reduction in CO2 emissions by 2015 Automobili Lamborghini announces its intention to complete its program of environmental sustainability in record time by presenting new plans which will enable the company: The plans for reducing emissions will thus involve two areas: modifications to the Lamborghini factory in Sant’Agata Bolognese, and development in vehicle design. To redefine its industrial processes in accordance with its policy of environmental sustainability, Lamborghini has just begun a project to complete installation of a large photovoltaic system by the end of 2009. The roof-top plant will produce 1,582 Megawatt hour (MWh) of “green” energy per year, which translates into a 20% reduction in CO2 emissions (-1,067,820 Kg/year) by 2010.