New Polaris 1202451 900 Fusion Snowmobile Sled Water Pump Shaft Gear Bearing Kit on 2040-parts.com
Barneveld, New York, United States
NOS water pump shaft kit we aquired from a dealer that closed. Fits 2005 RMK and switchback 900's. 8.75 % sales tax in NY. Free shipping within the US. Thanks!
|
Snowmobile Engine Components for Sale
- Nos new vintage hirth snowmobile sled engine cylinder 212a1 210r 399cc(US $149.99)
- Polaris xcr 800 2000 chaincase chain gear(C $100.00)
- Yamaha fx nytro 2009 starter gear(C $40.00)
- Yamaha fx nytro 2009 camshaft intake cam 1 srviper 2008-2015(C $100.00)
- Yamaha vmax 500 600 1994 1995 magneto flywheel 6031605d(C $85.00)
- Emgo starter handle - solid rubber w/end plug(US $6.26)
Skoda Yeti UK Prices
Sat, 18 Jul 2009Skoda has released UK prices and specifications for the Yeti The Skoda Yeti is a much better bet than the recently announced Skoda Fabia Scout – a butched-up Estate with two wheel drive – as it is the real deal, with proper four-wheel drive and the ability to actually do at least a decent amount of soft-roading and, in all probability, make a decent fist of some rougher stuff too. Admittedly, to keep headline prices low, there are two-wheel drive versions too, and these are the bargain priced ones – starting from £13,750 – but you”ll have to pay a fair chunk more to get a full 4×4 – prices on the Skoda Yeti 4×4 start at £17,170 for the 2.0 litre TDi Yeti S. Even the entry-level Yeti E comes with Aircon and remote locking, and the extras add up as you go through the range.
2011 Mercedes C-Class Facelift leak
Mon, 08 Nov 2010Is this the 2011 Mercedes C-Class Facelift? The current Mercedes C-Class is due a facelift in 2011 and we’re expecting the revamped Mercedes to put in its debut appearance at the Detroit Motor Show in January. But it looks like a bit of Mercedes’ thunder may have been stolen if the photo above is a genuine leak.
Councils to cut roadworks red tape
Tue, 19 Aug 2014COUNCILS in England could soon have the power to cut red tape and make road works much quicker and more accountable. The plan is to introduce permits for any company that wants to dig up a road, which means they will have to co-ordinate their work with other companies and local authorities to reduce the impact of delays on the public. The permit scheme could come into force as early as April 2015 and means anyone applying for a permit to carry out road works will need to present a convincing case for the work.