New Speedometer Tachometer Gauge Case Cover For Honda Cbr1000rr 2008- 2011 on 2040-parts.com
CHINA, CN
Gauges for Sale
- 1981 xj650 maxim speedometer bracket mount stay arm yamaha xj 650 750 1980-83(US $15.99)
- 98-99 1998 1999 zx600 ninja zx-6r meter gauges speedo tach mph fits kawasaki(US $85.00)
- Kawasaki zxr 400 m1 l1 zx250 zx 750 k1 j1 m1 l1 pilot box cover 14090-1074 nos(US $35.00)
- Kawasaki zx gpx 750 r f1 f2 ninja zx500 b1 zx600 c1 c2 fuel meter 28011-1092 nos(US $129.00)
- Kawasaki zx600 f1 f2 f3 ninja zx-6r 1995-1997 temperature meter 28011-1149 nos(US $139.00)
- Kawasaki zx400 d4 gpz 600 900 1000 rx a1 ninja temp meter 28011-1070 nos(US $149.00)
Mazda brings diesel back to Indy with 6 Skyactiv-D
Fri, 26 Jul 2013Diesel has enjoyed great success lately as a racing fuel, but there's one place it hasn't appeared for more than six decades: Indianapolis Motor Speedway. Mazda's breaking that dry spell this weekend, when its Mazda 6 Skyactiv-D race car will head to Indy for the Grand-Am race. We like the 6 in both road trim and racing livery, but that previous diesel-powered racer -- the Cummins Diesel Special -- is pretty neat too.
Saleen Performance to end S302 Ford Mustang production, prepares to expand
Wed, 09 Mar 2011If ordering a Saleen S302 Ford Mustang is on your wish list, the time to do it is now. Revstone Industries, owner of Saleen Performance Vehicles, said on Wednesday that it will stop taking orders for the car in May and will finish building Saleen Mustangs in suburban Detroit by the fall. But the Lexington, Ky.-based company is not getting out of the performance parts and merchandise businesses and isn't abandoning the vehicle-upfitting field, spokesman Pete Borum said.
BMW unveils its 2012 Olympic Games pavilion
Tue, 07 Feb 2012BMW has unveiled its new pavilion for the 2012 Olympic Games in London. The winning design came from British architects Serie after bids from six companies. As the sole automotive sponsor, BMW is allowed to build a pavilion at the Olympic Park during the London 2012 Olympic & Paralympic Games and it expects to draw 8000 visitors a day.