Find or Sell any Parts for Your Vehicle in USA

New Strg Gear Cardone Industries 97-5216gb on 2040-parts.com

US $574.49
Location:

Condition:New: A brand-new, unused, unopened, undamaged item in its original packaging (where packaging is applicable). Packaging should be the same as what is found in a retail store, unless the item was packaged by the manufacturer in non-retail packaging, such as an unprinted box or plastic bag. See the seller's listing for full details. See all condition definitions Manufacturer Warranty:1 Year Mfr Code:A1 Brand:Cardone Industries Type:Steering, Gear and Related Components, Power Manufacturer Part Number:97-5216GB

Legendary General Motors design chief Chuck Jordan dies at 83

Sun, 12 Dec 2010

UPDATED -- Chuck Jordan, the legendary designer who helped usher in the modern era of car styling at General Motors, died on Thursday evening, Dec. 9. He was 83.

BMW i3 EV: More than 8,000 ordered already

Tue, 15 Oct 2013

The BMW i3 EV already has 8k orders BMW has invested heavily in their new ‘i’ range of electric cars – as much as £2 billion it’s estimated – with the ‘i’ cars being developed from scratch rather than based on an existing BMW model. The first BMW i to be launched is the compact city car BMW i3, revealed in production form in July, which costs from around £30k for the regular EV and an extra 10 per cent for the i3 with a range extender engine. Despite being revealed in July BMW has not yet officially put the i3 on sale, but that hasn’t stopped potential buyers lining up to palce a reservation, with more than 8,000 already signed-up for an i3.

London underpass to hold flood water

Mon, 10 Feb 2014

A PEDESTRIAN UNDERPASS is to be turned into an emergency pond to hold hundreds of thousands of litres of floodwater threatening homes and businesses in south London. The Purley Cross underpass will be used to hold water pumped from around 400 under-threat buildings in parts of Kenley and Purley and to stop a water treatment works which supplies tens of thousands of homes from flooding, Croydon Council said. The authority said the plan to use the underground footway to hold around 600,000 litres of water from tonight was approved after its "primary" pond at Purley Depot overflowed last night.