Find or Sell any Parts for Your Vehicle in USA

Nissan Oem Battery-negative Cable 240800w000 on 2040-parts.com

US $55.52
Location:

Duluth, Georgia, United States

Duluth, Georgia, United States
Condition:New Genuine OEM:Yes Fitment Footnotes:Diag Ref #1;Negative; Quantity Sold:sold individually Category 1:Electrical SKU:100:24080-0W000 Quantity Needed:1 Brand:Nissan Category 2:Chassis Electrical Manufacturer Part Number:240800W000 Category 3:Battery Part Ref# on Diagram:ONLY PART REFERENCE #1 ON THE DIAGRAM IS INCLUDED Item Name:Negative Cable UPC:Does not apply

Grand National Roadster Show kicks off in California

Fri, 28 Jan 2011

History continued today at the Fairplex in Pomona, Calif., as the 62nd annual Grand National Roadster Show opened its doors for the weekend. Twelve open-topped hot rods will vie for the title of "America's Most Beautiful Roadster" and the right of their owners to scratch thier names onto the accompanying nine-foot-tall trophy. A few minor tweaks to the rules will make this year's judging something new.

Audi RS Q3 (2013) first official pictures

Wed, 20 Feb 2013

Audi's applied the RS badge to a soft-roader for the first time: this is the RS Q3. Using a slightly detuned TTRS engine, the RS Q3 puts 306bhp and 307lb ft through all four wheels, via a standard-fit dual-clutch gearbox Audi RS Q3: the powertrain spec The petrol-fuelled 2.5-litre five-cylinder turbocharged engine is related to the TTRS five-pot, but here it's developing 306bhp rather than 335bhp. Maximum torque is on tap from 1500rpm to 4200rpm.

2013 New York F1 Grand Prix cancelled

Fri, 19 Oct 2012

The 2013 Grand Prix of America in New Jersey has been dropped as organisers run out of time to prepare for the New York street F1 event. With Bernie Ecclestone pushing to get America to fall in love with F1, a headline F1 act on the streets of New York – a Monaco GP for the colonials – looked like a plan. But it’s a plan that’s now been postponed until at least 2014 after Bernie plugged the plug on organisers as they need more time to prepare for what will, by any measure, be a huge logistical task.