Nitrous Outlet Promax Dual-channel Progressive Controllers 00-61002 on 2040-parts.com
Saint Paul, Minnesota, United States
Nitrous Oxide for Sale
- 14125nos nos standard replacement bottle bracket(US $95.19)
- Nitrious kit 3.6 camaro(US $400.00)
- Moroso on/off switch lighted 97543(US $31.44)
- Nos 16132nos nos nitrous bottle nut / an combo wrench(US $57.88)
- 0027nos nos big shot single stage upgrade kit(US $370.95)
- 16232nos nos nos bottle nut & washer(US $34.10)
Nissan LEAF becomes London Taxi
Tue, 26 Jun 2012Nissan has been ferrying Londoners and tourists round the capital in the Nissan LEAF EV free of charge as part of its ‘Big Turn On’ campaign. Yesterday we reported that a Nissan LEAF was going to go backwards up the hillcimb at Goodwood in a bid for a reversing speed record, and to draw attention to the LEAF’s strengths as part of Nissan’s ‘Big Turn On’ campaign. We’re not too sure how being able to go backwards as quickly as you can forwards in a LEAF is a big selling point, but Nissan’s stunt in London this week is far more relevant – they’ve been offering fee taxi rides in the electric LEAF to tourists and Londoners alike.
Subaru’s seven-seat Exiga (2008): first pictures
Tue, 17 Jun 2008By Ben Whitworth First Official Pictures 17 June 2008 12:08 This is the Exiga, Subaru’s rather straightlaced seven-seat people carrier, designed to bridge the gap between the current Legacy and Tribeca. Based on existing Legacy architecture, the Exiga has a long 2750mm wheelbase, and at 4750mm long, 1775mm wide and 1660mm high, it’s roughly the same size as Ford’s S-Max. There’s a choice of two engines – both 2.0-litre petrols and both flat fours.
GM to double size of battery lab
Mon, 12 Apr 2010General Motors says it will spend $8 million to double the size of its Global Battery Systems Lab, which the company claims is the largest and most technologically advanced automotive battery lab in the United States. GM says the expansion will speed up the development of hybrid and electric vehicles, such as the upcoming Chevrolet Volt, by improving on-site testing of battery cells and systems. When finished, the lab will be 30,000 square feet bigger than it is now, for a 63,000-square-foot total.