Nos 1939 1940 1941 1942 Chevrolet Steering Shaft Upper Bearing 264887 6.521 on 2040-parts.com
Sherwood, Oregon, US
|
Other Parts for Sale
- ◆ 5 nos vintage mopar military box packaging for dodge truck steering dust cover(US $14.34)
- Nos gm hood hinge springs chevelle camaro gto nova skylark cutlass gs(US $299.99)
- ◄ 5 nos vintage mopar military box packaging for dodge cab door hinges pins part(US $13.34)
- 4 nos 1946 1947 1948 1949 chevrolet truck steering knuckle bushings 3686588 (US $39.95)
- Nos 1968 1969 pontiac headlight switch 1995155 b(US $99.95)
- New generator brushes, ford flathead 1939 two brush generator 91a-10047(US $9.99)
Rare early Jaguar E-Type sells for £88,000
Mon, 28 Oct 2013ONE OF THE MOST RARE Jaguar E-Types, and one of the first to be built in the 1960s sold has at auction for more than £88,000. An anonymous British buyer from the south of England bought the iconic sports car at an auction in Ascot, Berkshire. The hammer fell at £77,000, but with a buyer's premium the final bill was £88,040, a spokesman for Coys the auctioneers said.
Coventry University students prepare for the MA Design Degree Show
Fri, 25 Nov 2005MA students from England's Coventry University Automotive Design course are preparing for their annual degree exhibition. This year's Show, entitled '15' will present fifteen students work from the fifteen month course in the new Coventry Transport Museum in the centre of the city. The projects on show cover the full spectrum of vehicle concepts ranging from a luxury car inspired by Chanel perfume to a future proposal for a New York taxi and students have taken a wide variety of starting points for their project research.
London underpass to hold flood water
Mon, 10 Feb 2014A PEDESTRIAN UNDERPASS is to be turned into an emergency pond to hold hundreds of thousands of litres of floodwater threatening homes and businesses in south London. The Purley Cross underpass will be used to hold water pumped from around 400 under-threat buildings in parts of Kenley and Purley and to stop a water treatment works which supplies tens of thousands of homes from flooding, Croydon Council said. The authority said the plan to use the underground footway to hold around 600,000 litres of water from tonight was approved after its "primary" pond at Purley Depot overflowed last night.