Nos Ford F58z-3b478-c Cv Boot Clamp/cv Joint Boot Band on 2040-parts.com
Statham, Georgia, United States
CV & Parts for Sale
- Joint set drive shaft 302015100095 for fiat 46307914 -(US $)
- Joint set drive shaft 302015100224 for renault master/ii/box/van/bus 1.9l-(US $)
- Joint shaft audi q3 (f3b) suv 2.0 40 tfsi 16v quattro (dktc) 2019 5qf521101-(US $)
- Driveshaft front rh volkswagen touareg mk3 (cr) 2018 on 2967 diesel automatic(US $)
- 2008 757533202 bmw 3 series touring (e91) combi 318d 16v (n47-d20a) joint shaft-(US $)
- Driveshaft front rh kia carens mk3 (rp) 2013 on 1685 diesel manual(US $)
Saab seeks partner for new small car, aims to be a contract manufacturer
Fri, 25 Mar 2011Saab is continuing its search for a partner to help it build a new entry-level car and the company also wants to build vehicles for other automakers at its factory in Sweden, Chairman Victor Muller said. "We are talking with other manufacturers to buy a platform or drivetrain technology for this entry-level car," Muller told Automotive News Europe. "It should come as soon as possible, in 2014 the earliest." Muller said the car would be priced at about 20,000 euros, or about $28,300 at current exchange rates.
Bentley Continental GT3 – Bentley get back to Motorsport
Wed, 26 Sep 2012The Bentley Continental GT3 – a Continental GT prepared for the track – heralds Bentley’s intention to go racing. The Bentley Continental GT3 appears to be a lowered, widened and stripped- out GT with which Bentley plan to return to their roots and a long history of motorsport. whether that means supplying the GT3 as a customer car or a works racing team we don’t yet know.
First sight of Pininfarina-designed Eurostar trains
Fri, 19 Oct 2012Eurostar has unveiled the first images of its new Pininfarina-designed e320 trains that are currently under construction in Germany. A £700m overhaul of the Eurostar fleet has seen a refurbishment of its existing trains as well as the purchase of 10 new trains designed by the Italian design house. The entire new Eurostar fleet should be completed by 2015 with production of the new e320 trains and refurbishment of the existing trains well underway.