Find or Sell any Parts for Your Vehicle in USA

Ocean Signal Hr1e Replacement Hydrostatic Release on 2040-parts.com

US $92.56
Location:

Condition:New: A brand-new, unused, unopened, undamaged item in its original packaging (where packaging is applicable). Packaging should be the same as what is found in a retail store, unless the item was packaged by the manufacturer in non-retail packaging, such as an unprinted box or plastic bag. See the seller's listing for full details. See all condition definitions Brand:Ocean Signal Manufacturer Part Number:701S-00608 MPN:701S-00608 Model:701S-00608 UPC:5060266110108 GTIN:005060266110108 EAN:05060266110108 Type:Mounting Brackets

MG TF roadster likely to die this year

Wed, 16 Feb 2011

The venerable MG TF is likely to be axed this year after 16 years of production. The new Chinese-owned MG company has manufactured a few hundred TFs in Longbridge as it's taken its first tentative steps towards relaunching the famous brand in its home market. But Brits have bought just a handful of TFs since its relaunch in 2008.

BMW EfficientDynamics Concept teased +Video

Thu, 27 Aug 2009

The BMW tease for the EfficientDynamics Concept We already know that BMW will be bringing the ActiveHybrid X6 and ActiveHybrid 7 Series, and we’ve know for a while that they will be showcasing the BMW EfficientDynamics Concept. But what is this concept? In truth, BMW has done really well to hide the details.

Report Claims Pothole Repair Blackhole Is £12bn

Thu, 03 Apr 2014

FIGURES from the Asphalt Industry Alliance (AIA) have revealed the extent of the nation’s pothole crisis, with a report claiming the "catch-up" cost of getting roads back into reasonable a condition has soared to £12 billion. The total is an increase on the £10.5 billion figure reported last year, and remains high despite more than two million potholes being filled in England and Wales over the last 12 months. This was despite a 20% decrease in the shortfall in annual road maintenance budgets reported by local authorities, with the shortfall reducing from an average of £6.2 million to £5.1 million per authority in England.