Oil Injector And Maniold P/n 439780 From A 1998 Johnson 115 Ficht Outboard Motor on 2040-parts.com
Sarasota, Florida, US
Up for auction is an Oil injector and maniold p/n 439780 from a 1998 Johnson 115 ficht outboard motor
This was removed from an engine that was having fuel supply issues and the customer decided to repower as opposed to repairing the motor. We will be parting out the entire engine.
The Nautical Trader
Other for Sale
- Stbd & port clamp bracket #61a-43112-23-8d, 2000 yamaha 250hp outboard motor(US $101.40)
- C-map nt+ chart card for jacksonville florida to fort myers(US $29.00)
- Brand new 26 lb cqr style hinged plow boat anchor(US $79.00)
- Dacor double scuba tank manifold stamped tty and 3000 psi(US $19.00)
- Starter assembly for a 1985 johnson 140 hp outboard motor(US $29.00)
- Par jabsco 35515-0010 12 volt blower fan(US $29.00)
Bugatti Veyron L’Or Blanc (2011) first official pictures
Wed, 06 Jul 2011Another week, another special edition Veyron – and this one’s made from porcelain. Sort of. Bugatti has announced a partnership with Königliche Porzellan-Manufatur of Berlin, a German porcelain specialist whose ceramic trim adorns much of the new Bugatti Veyron L’Or Blanc.
Are Bugatti plotting a Final Edition ‘Super’ Veyron?
Sun, 23 Jun 2013Will the power of the Veyron Super Sport (pictured) grow to 1500bhp? The rumours that the Bugatti Veyron would, at some point, get more than its original 100bhp or so have been around seen the Veyron first launched. Eventually, Bugatti delivered and we got the Veyron Super Sport – with 1200bhp – back in 2010 which was, inevitably, followed by the convertible version in the guise of the Veyron Grand Sport Vitesse sporting 1200bhp and a hole to let the sky in.
Camaro plant gets more work; recall issued
Thu, 07 May 2009The strong early demand for the Chevrolet Camaro has General Motors looking to crank more units out of the Oshawa, Ontario, assembly plant. The Oshawa plant was exempt from GM's recent announcement of shutdowns of as long as nine weeks for several of its plants--primarily those that build pickups and SUVs. Oshawa will increase Camaro output by adding overtime and an extra week to the plant's production schedule.