Find or Sell any Parts for Your Vehicle in USA

Passenger Side Replacement Headlight 09-09 Chrysler 300 2.7l 3.5l - 4805756ak on 2040-parts.com

US $76.43
Location:

Ontario, California, US

Ontario, California, US
Returns Accepted:Returns Accepted Refund will be given as:Money Back Item must be returned within:60 Days Return policy details:Item must be in original packaging, brand new, and never installed. Return shipping will be paid by:Buyer Restocking Fee:No Manufacturer Part Number:CH2503218 Interchange Part Number:4805756AK Warranty:Yes

Headlights for Sale

Mini Paceman

Fri, 14 Sep 2012

Mini has presented its latest model, the Paceman, as it ventures into a new vehicle class. Appearing – almost to the millimeter, bar colour and trim detailing – to be the Paceman concept seen at NAIAS 2011 in Detroit, the Paceman Sports Activity Coupe features many traditional Mini design cues. Where it moves away from them, it is in keeping the new-style squared off front lamps of the Countryman (with which it shares a front end up to the base of the windscreen) and a roofline which tapers down much more than we've seen in any previous ‘new' Mini before.

Audi sells over 1,000,000 cars in 2008

Thu, 08 Jan 2009

Audi breaks the 1,000,000 car sales barrier in 2008 [ad#ad-1] Audi has really made an impression on the car market in the last decade. From the old Auto Union days (which was created by amalgamating the car makers Horch, Audi, DKW and Wanderer), it is now part of the German luxury car triumvirate – BMW, Mercedes and Audi – and considered to be the equal of the others. No mean feat.

Call for reform over road repair funding

Fri, 06 Jun 2014

FUNDING patterns mean most road maintenance is being carried out in "less-efficient, cold and wet" times, a report from a Government spending watchdog has said. The current pattern of funding, combined with the need to spend money within the financial year, means that most maintenance work goes on between September and March, said the report from the National Audit Office (NAO). It went on: "Although this is less disruptive for road users, it is less efficient than carrying out the work at other times of year because materials can be more difficult to handle in cold and wet conditions, and daylight hours are shorter." The report went on: "As a result of the additional funding for emergency repairs, which is made available at the end of the financial year, almost all highways authorities need extra capacity from the market at the same time, which makes it less likely that they will get value for money." The NAO report said there was a "lack of predictability" over road spending adding that historically, local highway authorities spent more revenue on maintenance, but were now carrying out fewer routine activities such as clearing gullies which are essential to preventing water seeping into roads' sub-structure.