Premium New Wheel Hub And Bearing Assembly Unit For Front Fits Left / Right Side on 2040-parts.com
ON, CA
Wheel Hubs & Bearings for Sale
- Premium new wheel hub and bearing assembly(US $104.39)
- Premium new wheel hub and bearing assembly unit for rear fits left or right side(US $25.26)
- Premium new wheel hub and bearing assembly unit for front fits left / right side(US $33.26)
- Premium new wheel hub and bearing assembly unit for front fits left / right side(US $43.24)
- Premium new wheel hub and bearing assembly unit for front fits left / right side(US $63.00)
- Premium new wheel hub and bearing assembly unit for front fits left / right side(US $71.25)
2015 BMW M4 Convertible debuts: drop-top fun priced from $73,425
Thu, 17 Apr 2014The 2015 BMW M4 Convertible made its official debut at the New York auto show yesterday. While the details of the high-octane hardtop didn't exactly catch us off-guard (see our full breakdown here), we now know how much it'll cost to feel the wind in your hair as you launch from 0-60 mph in 4.4 seconds: $73,425, to start. Complete pricing will be available closer to the M4 Convertible's sale date, which is “late summer” 2014, according to BMW.
N.J. decal law upsets teens, parents
Fri, 04 Jun 2010A New Jersey law--the first of its kind in the country--requiring drivers younger than 21 to put a small red decal on their license plates has both teens and adults upset, according to a story on the Wall Street Journal Web site. When one mother took her 16-year-old to the Motor Vehicle Commission for a learner's permit, the clerk told her she needed to buy red decals for her daughter. "When hell freezes over, I'll buy those stickers," she told the Journal.
KISKA opens new design studio
Thu, 19 Mar 2009Austrian brand management and design company KISKA has moved its design studio into a modern new building in Salzburg, Austria, just a few meters from its former location. The new headquarters boasts state-of-the-art workstations and has been built to enable the firm to prepare for expansion and new challenges in the years to come. Designed by Hofbauer architects, the 4700m² building was built in just one and a half years.