Find or Sell any Parts for Your Vehicle in USA

Quorum Va-190r Vehicle Alarm Fast/free Shipping on 2040-parts.com

US $21.99
Location:

New Paris, Indiana, United States

New Paris, Indiana, United States
Condition:New Manufacturer Part Number:VA-190R Brand:Quorum

QUORUM ALARM UNIT

MODEL: VA-190R

NEW IN BOX

SHIPPING: FAST AND FREE SHIPPING

LOCATION: B-2

Report Claims Pothole Repair Blackhole Is £12bn

Thu, 03 Apr 2014

FIGURES from the Asphalt Industry Alliance (AIA) have revealed the extent of the nation’s pothole crisis, with a report claiming the "catch-up" cost of getting roads back into reasonable a condition has soared to £12 billion. The total is an increase on the £10.5 billion figure reported last year, and remains high despite more than two million potholes being filled in England and Wales over the last 12 months. This was despite a 20% decrease in the shortfall in annual road maintenance budgets reported by local authorities, with the shortfall reducing from an average of £6.2 million to £5.1 million per authority in England.

McLaren tease the New F1 (P12)

Wed, 05 Sep 2012

With a debut at the Paris Motor Show on 27th September, McLaren releases the first teaser photo of their new hypercar. We’ve been anticipating the reveal of the new McLaren F1 – the McLaren P12 – for some time, and expected it to appear at Pebble Beach last month. The new car at Pebble Beach turned out to be the McLaren X-1 (although McLaren did take an iPad presentation of the new F1 for the delectation of the privileged few) but now we know for certain that the new McLaren will get its public debut at the 2012 Paris Motor Show.

Camaro plant gets more work; recall issued

Thu, 07 May 2009

The strong early demand for the Chevrolet Camaro has General Motors looking to crank more units out of the Oshawa, Ontario, assembly plant. The Oshawa plant was exempt from GM's recent announcement of shutdowns of as long as nine weeks for several of its plants--primarily those that build pickups and SUVs. Oshawa will increase Camaro output by adding overtime and an extra week to the plant's production schedule.