Racing Radios for Sale
- Rugged radios rdh16 business band handheld radio uhf - digital and analog(US $200.00)
- Sparco is-110 my2020 race rally intercom amplifier(US $111.00)
- Rugged radios intercom ptt to car harness push to talk (ptt) 6" adapter(US $20.00)
- Racing electronics 10370 headset strap heavy duty rubber loop style headset stra(C $47.60)
- Raceceiver carbox fits full enclosure(US $27.99)
- Raceceiver element with basic earpiece and pouch(US $264.90)
July 13: Pricing the power
Tue, 13 Jul 2010I got down to the car to drive home last night at about 11:00 p.m. and found that it had not been charging all day. I had plugged the cord into the wall outlet, plugged the cord into the car and walked off, without peering through the driver's window to see if the little red electrical plug light was on.
New Audi A8 Hybrid at Frankfurt – on sale in 2012
Wed, 24 Aug 20112012 Audi A8 Hybrid arrives at Frankfurt Audi turned up at the Geneva Motor Show in 2012 – just a few months after the launch of the New A8 – with a fully-featured concept of an Audi A8 Hybrid. At the time we expected them to roll out the A8 with hybrid gubbins by the end of 201, but that didn’t happen. Now, Audi are bringing the A8 Hybrid to the Frankfurt Motor Show next month in full production guise, ready to go on sale in 2012.
UK Government cuts car aid, EV grants at risk
Wed, 30 Jun 2010By Tim Pollard Motor Industry 30 June 2010 15:48 Britain's business secretary Vince Cable today fired a warning shot across the bows of the car industry, saying that subsidies would end and warning that the pledged £5000 subsidy off the first electric cars was in peril.'Our starting point is very clear,' he told delegates at an automotive summit arranged by the Society of Motor Manufacturers and Traders. 'We've moved on from the era of subsidies. We just have to be realistic about what's affordable.'Cable said the new coalition Conservative-Liberal Government had not yet decided whether or how to implement the new low-carbon vehicle subsidies promised under Labour, which had set aside £250m in initial funding.'It is still actively under consideration,' said Cable.