Rear Bushing Original Factory For Rear Axle Mazda Rx8 Rx-8 03-08 Se3p 13b 1,3 on 2040-parts.com
Rostov-on-Don, default, RU
REAR BUSHING for REAR AXLE for MAZDA RX8 SE3P 13B 2003-2008
new, original factory "mazda"
price for 2 pieces that the photo
e-mail, please, for any questions
shipping to worldwide
shipping to USA: 20$
shipping to Russia: 8$-10$
Have combined delivery
Many parts for mazda RX7, RX8, rx-7, rx-8
Control Arms & Parts for Sale
- 90 91 92 93 acura integra front lower control arm driver side oem(US $34.00)
- Saab 9000 front left lower control arm arms german oe replacement(US $131.99)
- Left control arm 10843 with ball joint and bushing 48654-12010(US $45.28)
- Ford lower arm control part # xw1z-3078-ba.front right (US $99.99)
- New oem sti aluminum front control arms 02-07 wrx(US $364.00)
- 93-02 camaro firebird rear end lower arm bar support ladder lt1 z28(US $18.00)
Brief 5 – Sculpting: CDN–GM Interactive Design Competition
Fri, 15 Aug 2014The Car Design News and General Motors Interactive Design Competition is now open. It offers you the choice of five briefs, each set by GM's design teams, and entries are invited at http://www.cardesigncontest.com/ Sculpting, the fifth and final brief, is new for this year's running of the design competition. The challenge is to explore automotive sculpting; the fundamental principles of line, form, proportion and scale.
2013 Lincoln MKZ starts at $36,800
Tue, 24 Jul 2012Lincoln says the redesigned 2013 MKZ sedan gets a base sticker price of $36,800 including the shipping charges. For that price you'll get a turbo four-cylinder making 240 hp, an adjustable suspension and a push-button shift for the automatic transmission. Interested in the hybrid version?
MINI’s Olympic Marketing Masterstroke
Wed, 08 Aug 2012BMW has spent £40 million sponsoring the 2012 London Olympics, but it’s a small fleet of remote controlled MINI’s that provide the value. BMW has done all it can to promote its sponsorship of the 2012 London Olympics, and with a spend said to be in the region of £40 million, who can blame them? But it’s not just local shopkeepers and enthusiastic small businesses that are hamstrung by Olympic rules on advertising, the Olympic sponsors are too.