Red Baron , Oil Drain Plug Volkswagen Strainer Kit -rb-219- 66-77 Vw on 2040-parts.com
Manassas, Virginia, US
Oil strainer and gasket kit from Red Barron. New old stock. $2 shipping and handling to cover a box, printing and tape. USPS flat rate padded envelop $7.70.
Oil Filters for Sale
- Fl1995 motorcraft powerstroke oil filters (6)(US $89.00)
- Ford diesel 6.0 powerstroke premium guard filter pkg.(US $86.95)
- Duramax ac-delco pf2232 oil filters (6)(US $78.98)
- Dodge ram cummins diesel delco oil filters(6)(US $58.95)
- Wix 51364 oil filter-engine oil filter(US $10.02)
- Wix 51391 oil filter-engine oil filter(US $12.77)
UK car sales up 11% in May (2013)
Thu, 06 Jun 2013The Ford Fiesta (pictured) was again the best selling car in the UK The rise and rise of new car registrations in the UK continues to defy the rest of the economy, with figures up in May 2013 by 11 per cent year on year, and private sales up a massive 20.9 per cent to levels last seen in 2007. It’s the fifteenth month in succession new car registration have risen in the UK, with sales for May at 180,111 and total sales to date in 2013 hitting almost 1 million units, at 948,666. The SMMT think the big jump in private registrations is down to a number of factors, including cars bought under the scrappage scheme now being traded in for a new car, strong incentives from car makers and the promise of new cars offering lower running costs, and they’re probably right, although there are other factors in play too.
Six questions for the creator of Gran Turismo
Wed, 03 Jun 2009When you are granted an audience with Kazunori Yamauchi, godfather of Gran Turismo, you take it. We spoke with his excellency in a suite overlooking downtown Los Angeles, where traffic on the twisted freeways below looked nothing at all like the thrilling tracks of that iconic game. AW: When did you make the first Gran Turismo?
Green Light For More Smart Motorway Schemes
Wed, 09 Jul 2014THE Government has announced plans to speed up journey times on selected parts of the nation’s motorway network. As a result, work will start to convert the hard shoulder into a running lane on two sections of the M1 and on a stretch of the M3. The M1 work will be between junctions 28 and 31 in Derbyshire and between junctions 32 and 35a in South Yorkshire, with claims that it will boost capacity by up to a third and improve journey times by up to 10%.